Lecture 3: Manufacturing Scheduling Concepts

Lecture 3: Manufacturing Scheduling Concepts. Outline. Jobs & Operations Characteristics & notation Resources/machines Setup/transition cost Objective functions Complexity. M 1. M 2. M 3. S ij. C ij. S ij – starting time of job j on machine i C ij – completion time of job j.

Angelica
Télécharger la présentation

Lecture 3: Manufacturing Scheduling Concepts

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lecture 3: Manufacturing Scheduling Concepts © J. Christopher Beck 2005

  2. Outline • Jobs & Operations • Characteristics & notation • Resources/machines • Setup/transition cost • Objective functions • Complexity © J. Christopher Beck 2005

  3. M1 M2 M3 Sij Cij Sij – starting time of job j on machine i Cij – completion time of job j Jobs rj dj wj pij pij – processing time of job j on machine i rj – release date of job j dj – due date of job j wj – weight of job j © J. Christopher Beck 2005

  4. Jobs & Operations • Often jobs are made up of a set of operations rj dj wj p2j p0j p3j p1j precedence constraints © J. Christopher Beck 2005

  5. Example: House Building Excavate Floor joists Foundations … 4 wks 2 wks 3 wks Exterior plumbing … 3 wks © J. Christopher Beck 2005

  6. Resources/Machines • Jobs may need resources • Mixing machine, back-hoe, cement mixer • May be multiple similar resources are available and you need to choose one © J. Christopher Beck 2005

  7. House Building Resources Excavate Floor joists Foundations … 4 wks 2 wks 3 wks requires Carpenter Exterior plumbing Backhoe Backhoe operator Dump truck … … 3 wks © J. Christopher Beck 2005

  8. Resources & Setup • If 2 jobs need the same resource (and the resource can only do 1 thing at a time), then the jobs must be sequenced • May be a time or cost for a resource to change jobs (“sequence dependent setup”) © J. Christopher Beck 2005

  9. Objectives • Minimize maximum completion time (aka “makespan”) • Min Cmax • Cmax = max(C1, … Cn) • Minimize maximum lateness • Min Lmax • Lmax = max(C1 – d1, … Cn – dn) © J. Christopher Beck 2005

  10. Objectives • Minimize total weighted tardiness • Min ΣwjTj • Tj = max(Cj – dj, 0) © J. Christopher Beck 2005

  11. Exercise 2.1 a) Draw precedence graph b) Calculate makespan

  12. Hard Problems vs. Easy Problems • Exercise 2.1b was “easy” • Adding resources would have made it hard • Hard & easy have precise mathematical definitions • You need to have, at least, an intuitive understanding of what this means © J. Christopher Beck 2005

  13. Hard vs Easy • Easy: • Sort n numbers • Solve a system of linear equations • Hard: • Schedule a factory, deliver packages, schedule buses, … © J. Christopher Beck 2005

  14. Hard vs Easy • f (n): the number of “basic operations” needed to solve the problem with input size n • Easy: f (n) is polynomial in n • O(n), O(n log n), O(n2), … • Hard: f (n) is exponential in n • O(2n), … © J. Christopher Beck 2005

  15. Hard vs Easy

  16. Hard vs Easy

  17. Hard vs Easy

  18. Hard vs Easy

  19. Hard vs Easy • 10301 operations required in worst case • Age of universe: 1018 seconds • Fastest Computer today: 1014 op/sec • Let’s say we get a computer 1018 times faster (a sextillion times faster) • 1033 op/sec • It may still take 10250 times longer than the age of the universe to solve the problem! © J. Christopher Beck 2005

  20. Hard vs Easy • If it is going to take 10250 times the age of the universe to schedule a factory, why bother? © J. Christopher Beck 2005

  21. Hard vs Easy • If it is going to take 10250 times the age of the universe to schedule a factory, why bother? • May be we can do it in a reasonable time in most cases? • May be we can get a good (but not necessarily best possible) solution in a reasonable amount of time? © J. Christopher Beck 2005