1 / 14

Installation: the plan

Installation: the plan. Reality. Pressure dome: the problem. The Rack, Mark I. Scan Head, in place, finally. 144Z AMS Configuration. Pressure Vessel “Doghouse”. Equipment Racks -. Cable Run. AMS Mosaic 3/1/13. Magna, UT. Kennecott Smelter. Kennecott Stack 3/1/13. Kennecott Stack.

Anita
Télécharger la présentation

Installation: the plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Installation: the plan

  2. Reality

  3. Pressure dome: the problem

  4. The Rack, Mark I

  5. Scan Head, in place, finally

  6. 144Z AMS Configuration Pressure Vessel “Doghouse” Equipment Racks - Cable Run

  7. AMS Mosaic 3/1/13 Magna, UT Kennecott Smelter

  8. Kennecott Stack 3/1/13 Kennecott Stack

  9. DRAFT West Valley City, UT 3/1/13 RSAC

  10. AirCell Issues • Leaver Arm Measurements for Applinix • Installed electronics into IPM box • Integrate IPM and conduct ground tests • Reconfigure AirCell for static IP and reset router • Connect IPM to AirCell and AMS • Test Ground Processing Software Connection

  11. Wasatch Front 3/29/13 -112.245 42.069 7,5,3 7.6m

  12. Wasatch Front 3/29/13

  13. Utah Lake 3/29/13 • Imagery will be evaluated by USGS for hot spring monitoring project

  14. Questions