MILCON, MRE Program Environmental Update

Agenda. MILCONCurrent Status07 SubmissionsMR

Leo
Télécharger la présentation

MILCON, MRE Program Environmental Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. MILCON, MR&E Program & Environmental Update

    2. Agenda MILCON Current Status 07 Submissions MR&E Eligibility & Submissions Funding Streamlining Environmental

    3. Military Construction (MILCON) Projects MILCON

    4. DLA MILCON Program Project Dollars by CINC The projects shown are the total currently identified MILCON requirement for the FY 96 - 03 programs. As you can see, the lions share of the MILCON projects programmed are AF initiatives. The projects shown as DFSC are Korea tie-in projects. The projects shown are the total currently identified MILCON requirement for the FY 96 - 03 programs. As you can see, the lions share of the MILCON projects programmed are AF initiatives. The projects shown as DFSC are Korea tie-in projects.

    5. PERISC En Route Infrastructure MILCON Purple completed Black in progress Blue designed Green programmedPurple completed Black in progress Blue designed Green programmed

    6. 2007 Pacific MILCON Submissions NSF Diego Garcia Construct Tank $17.2 M Elmendorf AFB Type 4 Hydrant $14.8 M FISC Pearl Harbor - Replace Kuahua Pipelines $15.2 M Replace Five Tanks $60.9 M Replace Red Hill Rails $ 5.9 M Kunsan AB Construct Tank $10.3 M Osan AB Type 3 Hydrant $11.9 M Yokota AB Type 3 Hydrant $19.5 M Total $ 155.7M

    7. DLAs MILCON Program Funding History This chart shows the history and future projections for the Fuel MILCON program. This chart shows the history and future projections for the Fuel MILCON program.

    8. MILCON Program Alternatives The projects shown are the total currently identified MILCON requirement for the FY 96 - 05 programs. The projects shown are the total currently identified MILCON requirement for the FY 96 - 05 programs.

    9. Maintenance, Repair, & Environmental (MR&E) Program

    10. MR&E Funding Eligibility Eligible projects must store, distribute, assure quality, or assure regulatory compliance for DLA owned-product. The MR&E program can only be used to fund work on real property facilities. Mobile equipment such as barges, trucks, & portable generators is not eligible.

    11. FY04 MR&E Submission Flow For PACOM

    12. MR&E Program Program Expenditures

    13. MR&E Program Active Projects by CINC

    14. DESC MR&E Budget Three colors of MR&E funds: MR&E: All Maintenance, $192.8M Repair, and Env projects MC (operating): below $100k $ 6.3M MC (capital): $100k to $750k $28.6M FY03 budget: $227,700,000

    15. What is PACOMs share?

    16. MR&E Current Issues Capitalization of New Products Fuel Oil Reclaimed (FOR) at FISCs E85 and Biodiesel JPTS as of Oct 02 NOT Capitalized Compressed Natural Gas (CNG) In FY02: MILCON threshold was raised to $750,000 Streamlining MR&E Projects (MATOC, 8(a), Raise auth. levels) Revising SPCC plans (40 CFR 112)

    17. MR&E Approval Limits

    18. MR&E Projects Requiring DLA Approval This chart shows the number of sites and number of active projects for each Service. The AF now has the largest number of projects in our MRE Program. The Navy has been the biggest player in the MRE Program throughout phase I of IMM for the past 12 years and continued this trend through the initial years of the phase II implementation. The number of AF sites participating in IMM Phase II has increased each year, putting the AF on the same level with the Navy in terms of numbers of projects submitted and funding annually. This chart shows the number of sites and number of active projects for each Service. The AF now has the largest number of projects in our MRE Program. The Navy has been the biggest player in the MRE Program throughout phase I of IMM for the past 12 years and continued this trend through the initial years of the phase II implementation. The number of AF sites participating in IMM Phase II has increased each year, putting the AF on the same level with the Navy in terms of numbers of projects submitted and funding annually.

    19. Centrally Managed Programs & Special Assignments

    20. MR&E Program Managers

    21. DESC Environmental Services Good morning/afternoon. I am _______________, and I work as an environmental protection specialist at the Defense Energy Support Center. Today Im going to give you an overview of environmental costs at your fuel storage facilities which are eligible for DESC funding. The information that I will cover can be found in Chapter 11 of DESCs Environmental Guide for Fuel Terminals. (show copy of Guide). Good morning/afternoon. I am _______________, and I work as an environmental protection specialist at the Defense Energy Support Center. Today Im going to give you an overview of environmental costs at your fuel storage facilities which are eligible for DESC funding. The information that I will cover can be found in Chapter 11 of DESCs Environmental Guide for Fuel Terminals. (show copy of Guide).

    22. Let me give you a little bit of background as to who and what is the Defense Energy Support Center. Were one of the supply centers of the Defense Logistics Agency and were responsible for the purchase, transportation, storage and distribution of petroleum products used by the military services. Were located at Ft. Belvoir, VA. Within DESC there is the Facilities Management & Distribution Business Unit. Thats where the Environmental section resides. We have responsibility for the environmental compliance, remediation, and safety issues at 10 active GOCO petroleum storage facilities across the country. We also are responsible for monitoring the environmental cleanup of 10 closed GOCO petroleum storage facilities. But, the part that is really important to you is the support we provide for the review and funding of environmental compliance and remediation projects at your facilities.Let me give you a little bit of background as to who and what is the Defense Energy Support Center. Were one of the supply centers of the Defense Logistics Agency and were responsible for the purchase, transportation, storage and distribution of petroleum products used by the military services. Were located at Ft. Belvoir, VA. Within DESC there is the Facilities Management & Distribution Business Unit. Thats where the Environmental section resides. We have responsibility for the environmental compliance, remediation, and safety issues at 10 active GOCO petroleum storage facilities across the country. We also are responsible for monitoring the environmental cleanup of 10 closed GOCO petroleum storage facilities. But, the part that is really important to you is the support we provide for the review and funding of environmental compliance and remediation projects at your facilities.

    23. Regional Highlights Pacific POC Jack ODonovan GOCOs 3 Active in Korea (Kunsan, Yechon & Pohang) + Fuels Laboratory GOGOs 72 facilities Highlights Korean GOCO Spill Prevention & Hazwoper Training Korean GOCO SPCC Plan Updates Okinawa USMC USTs removed/replaced with SCATS Okinawa USMC Gas Stations converted from GOGO to GOCO

    24. Regional Highlights Alaska POC Wayne Barnum GOCOs 1 Active P/L in Alaska, 2 Inactive in Alaska GOGOs 10 facilities Highlights DFSP Anchorage Big Dig a success have ROD DFSP Whittier steam sparge system start-up/operating Eielson AFB P/L spill response support Continued SUPSALV Tier I, II, & III response funding

    25. DESC Worldwide Environmental Costs

    26. DESC Worldwide Environmental Costs

    27. Environmental Compliance Assistance Available

    28. Spill Remediation Assistance Available

    29. Pollution Prevention Assistance Available

    30. ENV Challenges Increase Participation in Enviro. Compliance Program Revised SPCC Regulations

    31. COMPLIANCE PARTICIPATION (Pacific Theater) Fiscal Year Participation* 02 17% 01 18% 00 15% 99 10% 98 11% * % Eligible Bases Requesting DESC Funds

    32. 40 CFR 112: SPCC Revisions Applicable ONLY at Locations Subject to Compliance with Federal Regulations Typically not Overseas Unless Dictated by Country Specific Environmental Governing Standards 17 Jul 02 Final Revised SPCC Rule Published 17 Aug 02 Revised SPCC Rule Effective 17 Feb 03 Plan Review/Amendments Required 18 Aug 03 Plan Implementation Required

    33. SPCC Revisions Major Changes SPCC applies to facilities storing over 1,320 gallons of oil aboveground USTs not included in Volume Thresholds Containers 55 Gal and up are included Plan Must be Certified in Compliance w/ Industry Standards Mandatory Containment / Diversion Capability Additional Training and Inspection Requirements

    34. SPCC Revisions Additional Info Full Text of the Rule: http://www.epa.gov/fedrgstr/EPA-WATER/2002/July/Day-17/ Assistance or Detailed Analysis of Revisions Contact: Jack ODonovan Cmcl: (703) 767-8309 DSN: 427-8309 Email: Jodonovan@desc.dla.mil

    35. Questions?