1 / 4

VHT SG September 2007 Closing Report

VHT SG September 2007 Closing Report. Authors:. Date: 2007-09-20. Abstract. This document is the closing report for the Very High Throughput Study Group for the September 2007 interim session. Work Completed. The meeting on Monday included three presentations:

RoyLauris
Télécharger la présentation

VHT SG September 2007 Closing Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VHT SG September 2007 Closing Report Authors: Date: 2007-09-20 Eldad Perahia, Intel Corporation

  2. Abstract This document is the closing report for the Very High Throughput Study Group for the September 2007 interim session. Eldad Perahia, Intel Corporation

  3. Work Completed • The meeting on Monday included three presentations: • Proposed ITU/WRC Spectrum And Usage Allocation For Terahertz Frequencies -- submission 11-07/2359r1 by David Britz, AT&T • Analysis on IEEE 802.11n MAC Efficiency -- submission 11-07/2431r0 by Minyoung Park, Intel Corporation • Review of TGn’s Usage Models -- submission 11-07/2371r0 by Eldad Perahia, Intel Corporation • The meeting on Thursday included three presentations: • IMT-Advanced Status Report -- submission 11-07/2500r0 by Darwin Engwer, Nortel Networks • VHT Applications -- submission 11-07/2587r0 by Gal Basson, Wilocity • Probing the will of the SG -- submission 11-07/2472r0 by Marc de Courville, Motorola Eldad Perahia, Intel Corporation

  4. Goals for November • Presentations related to “call for submissions” • WFA presentation on usage scenarios • Begin work (and make progress) on PAR & 5 C’s • Review of skeleton (07/574r1, Darwin’s draft of PAR & 5C’s) • Presentation on Process & Procedures for TG Eldad Perahia, Intel Corporation

More Related