Purpose of this meeting: Show summary of WP2 tasks Prepare for the meeting next week WP2 has 3 slots for presentations: Thursday morning plenary (summary of today’s discussion); Thursday morning parallel (key lessons from LHC 2011 operation);

abdul-cline
Télécharger la présentation

Preparation for 1 st General HL-LHC Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Purpose of this meeting: • Show summary of WP2 tasks • Prepare for the meeting next week • WP2 has 3 slots for presentations: • Thursday morning plenary (summary of today’s discussion); • Thursday morning parallel (key lessons from LHC 2011 operation); • Friday public meeting (baseline scenario -> April meeting) • Summary of WP2 resources and deliverables • Preparation for the organization within each task • Discussion and organization of WP2 tasks • Each task leader will present a proposal for topics. • Each task leader will present a proposal for the modus operandi • Discussion and organization of WP2 • Discussion on WP webpage. Preparation for 1st General HL-LHC Meeting O. Brüning – BE-ABP 1 WP2 HL-LHC meeting 11. November 2011

  2. WP2 Tasks within the EU funded HiLumi Design Study: • Task 2.1: Coordination and Communication  Andy & myself • Task 2.2: Optics and Layout  Bernhard Holzer • Task 2.3: Particle Simulations  Massimo Giovannozzi • Task 2.4: Collective Effects  Elias Metral • Task 2.5: Beam-Beam Effects  Werner Herr • Task 2.6: Beam Parameter  Andy & myself Preparation for 1st General HL-LHC Meeting • Additional WP2 Tasks outside the EU funded HiLumi Study: • Task 2.7: Intensity limitation from existing LHC hardware  Ralph Assmmann O. Brüning – BE-ABP 2 WP2 HL-LHC meeting 11. November 2011

  3. Summary of WP2 Resources: • We need to identify a corresponding resource loaded plan • We can assign more, but not less resources for each partner Preparation for 1st General HL-LHC Meeting O. Brüning – BE-ABP 3 WP2 HL-LHC meeting 11. November 2011

  4. Summary of WP2 Deliverables: • We can update task activities but have to stick to the above • deliverables Preparation for 1st General HL-LHC Meeting O. Brüning – BE-ABP 4 WP2 HL-LHC meeting 11. November 2011

  5. Interaction with other work packages: • WP1: Project management • WP3: Magnet design •  IR layout for heat deposition studies •  iteration on magnet length and aperture •  Field quality and aperture specifications etc •  Corrector package specification • WP4: Crab Cavities  IR design with crab cavities & Beam parameters and performance etc. • WP5: IR collimations  IR design and layout • WP7: Machine protection • WP8: Collider-Experiment Interface • WP10: Energy deposition and shielding • WP11: 11 T dipole two-in-one  cryo collimatorsstudies • We can update task activities but have to stick to the above • deliverables Preparation for 1st General HL-LHC Meeting O. Brüning – BE-ABP 5 WP2 HL-LHC meeting 11. November 2011

  6. Modus Operandi: • communication between collaborators •  News Letters & email lists; Wiki pages; meetings [EVO or real] •  Within each task and within the WP2 • Communication between work packages •  News Letters & email lists; Wiki pages; meetings [EVO or real] • Frequency of meetings •  EVO and real • We can update task activities but have to stick to the above • deliverables Preparation for 1st General HL-LHC Meeting O. Brüning – BE-ABP 6 WP2 HL-LHC meeting 11. November 2011