1 / 15

PELINDO III

PELINDO III. INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING. CAMBODIA , 8 - 11 DECEMBER 2010. INDONESIA PORT CORPORATIONS. IPC I. Medan. IPC II. IPC IV. Jakarta . Makassar. Surabaya. IPC III. Indonesia Port Corporation I. Indonesia Port Corporation II.

abena
Télécharger la présentation

PELINDO III

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010

  2. INDONESIA PORT CORPORATIONS IPC I Medan IPC II IPC IV Jakarta Makassar Surabaya IPC III Indonesia Port Corporation I Indonesia Port Corporation II Indonesia’s state-owned port companies: Indonesia Port Corporation III Indonesia Port Corporation IV

  3. PROFILE OF INDONESIA PORT CORPORATION III 43 Ports 2 Business Units IPC III 5 SubsidiaryCompanies Total area : 248.524 KM2 (13% of total area in Indonesia) 1. PT. TPS (Container Terminal) 2. PT. BJTI (Logistics) 3. PT. RSPS (Hospital) 4. PT. Portek Indonesia (Equipment) 5. PT. Ambapers (Channel Operator) • PT. TPS (container terminal) • PT. BJTI (logistics) • PT. RSPS (hospital) • PT. PORTEK INDONESIA (equipment) • PT. AMBAPERS (channel maintenance) Operations area : 7 provinces out of 33 provinces in Indonesia Serve 88.641.069 people (40.50% of total population)

  4. IPC III IN TRANFORMATION IPC III Terminal Operating Company Port Operating Company

  5. IPC III MAJOR PROJECTS DENPASAR SELATAN SANUR Surabaya Western Access Channel (SWAC) PELINDO III TelukLamong Multipurpose Terminal ANGKASA PURA * Benoa Cruise Terminal Notes : Usulan Rute Tol Baru Land or Mangrove Edge New Island (marina &Fishery) Cruise Ships Rute Tol Awal NUSA DUA TOURIST RESORT INTERNATIONAL CONVENTION HALL

  6. SURABAYA WESTERN ACCESS CHANNEL -10,14 m LWS KODECO'S PIPE CONDITION THAT UNFOLDED -12 m LWS -20 m LWS KODECO PIPELINE RECOMMENDED PIPELINE AMERADA HESS APBS IMPROVEMENT THREATS SHIPPING LANES • SHIPPING LANES • Length : 25 mil laut • Width : 100 Meter • Depth : 9,50 M LWS • Total SBN : 18 buoys + 7 (NEW) LOCATION COORDINATE IN TANJUNG PERAK : 112°43’22”BT 7°11’54” LS Water area :1.547,3 Ha Land area :574,7 Ha PORT OF TANJUNG PERAK

  7. DEVELOPMENT PLAN OF SWAC Area Anchorage Area Anchorage Area Anchorage No.1 3 CHANNEL WIDTH 100 m DEPTH -9,5 m 5 SWEBERCONQUEST 2 JAVA Current Width: 100 Meter Depth : - 9,50 M LWS Capacities: 27.000 Moves/Years 7 PILOT STATION Kr. Jamuang 9 4 Pipa Gas Lama Lebar 100 m LWS 9,5 m 11 Buoy MAFIA Lebar 150 m LWS 10 m - 11 m 6 13 MADURA 15 Future Width : 200 Meter Depth : - 14 M LWS Capacities : 58.000 Moves/Years Maspion 8 Smelthing Alpha DMB 88 Petro Kimia Dermaga Gresik PLTU 10 Rede Tg. Perak Surabaya PORT OF TANJUNG PERAK SURABAYA

  8. TELUK LAMONG MULTIPURPOSE TERMINAL (1) • Accommodate overflow of Tanjung Perak Port. • Increase Capacity. • Built on an artificial island in area of 50 hectare. • Structures • Causeway : 1.280 M • Berth: 51.200 m2 (1.280 x 40m) • Container Yard : 364.800 m2 • (9.600 ground slots) • 5. CY Capacity : • 1.708.200 Teus/Years • 6. Support Facility : • Causeway, Bridge, Gate in/out, office, road and workshop, parking area, CFS.

  9. TELUK LAMONG MULTIPURPOSE TERMINAL (2) Activities that have been done : - Feasibility study - Detailed Engineering Design - Bidding process for civil construction - Earth breaking to commence construction

  10. BENOA AS CENTER OF CRUISE DESTINATION CRUISE SHIP TO INDONESIA (2010) 236 CALLS

  11. PROPOSED DEVELOPMENT OF BENOA DENPASAR SELATAN SANUR PELINDO III ANGKASA PURA * Notes : Usulan Rute Tol Baru Land or Mangrove Edge New Island (marina &Fishery) Cruise Ships Rute Tol Awal NUSA DUA TOURIST RESORT INTERNATIONAL CONVENTION HALL

  12. BENOA DEVELOPMENT PLAN (1) SHORT TERM PROGRAM

  13. BENOA DEVELOPMENT PLAN (2) SHORT TERM PROGRAM - Deepening and widening port basin - Straightening acces channel I

  14. BENOA DEVELOPMENT PLAN (3) MASTERPLAN

More Related