An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE DORIS NETWORK: STATUS REPORT ON RENOVATION AND COLLOCATIONS Hervé FAGARD (Institut Géographique National)

  2. The network on 2003/01/01 • 56 stations, 33 countries • Circles: SPOT-n & Envisat, 12°

  3. Distribution of the DORIS equipment Version 1.0 or 1.1 beacon Version 2 beacon Version 3 beacon + + + + + + Alcatel antenna Alcatel antenna Alcatel antenna Starec antenna Starec antenna Starec antenna 9 stations 24 stations 1 station 12 stations 1 station 9 stations

  4. Evolution of the network SPOT-5 ENVISAT JASON SPOT-3 SPOT-4 TOPEX SPOT-2

  5. Network: latest news • Two new stations installed at the end of 2002: • Thule (Greenland) • Sal (Cape Verde), replacing Dakar • Theoretical orbit coverage (when all stations are operating): • “Low” satellites (SPOT-2 , 4, 5 & Envisat) : 88 % • “High” satellites (Topex & Jason): 98 % • Stations renovated in 2002: • Tristan da Cunha, Terre Adélie, Port Moresby, Kauai • Next planned renovations: • Manila (next week) • St Helena, Ascension (March) • Mount Stromlo destroyed by fire in January; should be rebuilt by mid-2003

  6. Network renovation progress

  7. Antennas estimated stability (2002/01/01)

  8. Collocations with other IERS techniques:theoretical vs. actual • Many collocated instruments are not currently operating: • Discontinued long-term occupation by: • VLBI (Richmond, Santiago) • SLR (e.g. Dionysos, Easter Island, Goldstone, etc.) • Short duration (2 days only once, to a few days per year) mobile VLBI occupation (Toulouse, Ponta Delgada, Metsähovi, Greenbelt) • Unreliable tie: • Insufficient accuracy, measured only once, sometimes many years ago • Very long baseline, different geological movements (e.g. Kourou) • Network future evolutions should aim at adding a few VLBI and SLR collocations

  9. Theoretical/actual number of collocations

  10. Theoreticalcollocations with other IERS techniques

  11. Actualcollocations with other IERS techniques

  12. DORIS-DORIS collocations (1) • 29 DORIS stations have multiple antenna positions: • Two different antenna positions at 21 sites • Three different antenna positions at 8 sites • All ties between different antenna positions on the same site have been measured accurately, except: • AMSA-AMSB (approximate connection planned, AMSA no longer exists) • HBKA-HBLA (antenna moved by host agency, no direct survey) • HELA-HELB (antenna change by host agency, no survey) • KERA-KERB (dubious KERA antenna height) • GOLA-GOMA (no direct connection)

  13. DORIS-DORIS collocations (2)

  14. Tide gauges collocations (<10 km)

More Related