1 / 68

E nviromental I mpact S tatement

E nviromental I mpact S tatement. D evelopment P roposals for the B arkarby F ield. S. B engoa X avier N aldi C hiara S ai F lorence K ai K warteng O wusu A kyaw I llueca M unoz J acobo & S tojanovski T odor. P r e s e n t. O ctober 13 th. P resentation. EIS.

adah
Télécharger la présentation

E nviromental I mpact S tatement

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EnviromentalImpactStatement Development Proposals for the Barkarby Field S Bengoa Xavier Naldi Chiara Sai Florence Kai Kwarteng Owusu Akyaw Illueca Munoz Jacobo & Stojanovski Todor P r e s e n t October 13th Presentation

  2. EIS Description of Alternatives

  3. Zero-Alternative

  4. Zero-Alternative • The proposed development does not take place • The Barkarby Airport remains • No -or few- new housing in the area

  5. Zero-Alternative • Increasing road traffic of approx. 2% per year • Increasing noise pollution (plane and road traffic) • Increasing air pollution (plane and road traffic)

  6. Zero-Alternative • Expansion of the IKEA commercial area in the south • Creation of a Natural Reserve around the Igelbäcken • Slow restoration of military damaged forests

  7. Alternative 2 The ”Anatomic” development

  8. Alternative 2 • The ”Anatomic” development • The smallest option • All around the Barkarby village with a green belt in between

  9. Alternative 2 • Area concerned: 86.5 hectares • 4600 new inhabitants • 11 housing areas (9 with apartments – 2 with villas) • No public transport network

  10. Description of Alternatives Alternative 4 The ”American Dream” development

  11. Alternative 4 • The ”American Dream” development • The medium-sized option • Mixed use: housing & commercial/business • Only on the North of Norrviksvägen

  12. Alternative 4 • Area concerned: 95.49 hectares • 7170 new inhabitants & 3640 work places • 6 housing areas (6 with apartments – 2 with villas) & 3 commercial/business areas • Bus network, pedestrian and cycling paths in the housing areas

  13. Alternative 12 Description of Alternatives The ”Tutti Frutti” development

  14. Alternative 12 • The ”Tutti Frutti” development • The biggest option • Mixed use: housing & commercial/business • Around the village of Barkarby (North, East and South)

  15. Alternative 12 • Area concerned: 133 hectares • 11000 new inhabitants • 7 housing areas, all with apartments & some commercial areas (undefined) • New tunnel under the whole area moving the transiting traffic • Bus network, pedestrian and cycling paths

  16. EIS Traffic Air Quality

  17. Traffic Assumptions • Traffic increase 2% per year • Timescale of 10 years

  18. Air Quality CO Emissions

  19. Air Quality NO2 Emissions

  20. Main Facts • NO2 is the only pollutant to be considered • Not a major threat over 10 meters • Motorway represents the main pollutant source

  21. EIS Traffic Noise Impact

  22. Baseline

  23. 0-Alternative

  24. Mitigation Measures • Public-bus network • Speed limit • No-building area • Screens

  25. EIS Hydrology Water Quality & Runoff

  26. Runoff • Baseline runoffs: • Igelbäcken 45 l/s • Bällstaån 120 l/s

  27. Runoff • Very small runoff increase • Cumulative impacts. Be careful!!!

  28. Water Quality • Less nitrogen released • Phosphorus increase in Bällstaån

  29. Main Facts • Overflow will increase • Improved water quality

  30. EIS Ecology Flora, fauna & landscape

More Related