ea technology. Partners in power asset management. MicroCHeaP: Month 24 meeting Athens Work Package 4 presentation 21 September 2006 Presented by Yvonne Dickson. MicroCHeaP WP4. Presentation Title: Micro-CHP in an electricity network Presentation Summary:

adeola
Télécharger la présentation

ea technology

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ea technology Partners in power asset management MicroCHeaP: Month 24 meeting Athens Work Package 4 presentation 21 September 2006 Presented by Yvonne Dickson

  2. MicroCHeaP WP4 Presentation Title: Micro-CHP in an electricity network Presentation Summary: EA Technology company structure STP Module 5 programme of projects Distributed Generation (includes micro-CHP) Module 5 scope & objectives Module 5 projects in September 2006 Publication of project results

  3. Technical Services Consultancy Products Company Structure EA TECHNOLOGY

  4. Strategic Technology Programme Network Asset Management Technology Forums Software Solutions CONSULTANCY Strategic Asset Management New Energy Technologies

  5. Distributed Generation Module Strategic Technology Programme STP Module 5 = The Strategic Technology Programme (STP) provides research, development and technology to Electricity Distribution Network Operators (DNOs) in the UK and Ireland

  6. What is “Distributed Generation”? • All generation connected to an electricity distribution network (up to 132kV) potentially selling surplus electricity back into the network, including: – Small-scale plant that supplies electricity to a building, industrial site or community – Microgeneration, ie small installations of solar panels, wind turbines or biomass/waste burners that supply one building or small community • Combined Heat and Power (CHP) plant, including: – Building or community level CHP plant – Micro-CHP plant that effectively replaces domestic boilers, generating both electricity and heat for the home

  7. Growth in UK electricity generation from renewable sources [DTI June 2006]

  8. Ancillary Services Stability Security Power Power Power Operation Active Management Power Island Mode Reliability Maintenance New Network Design Concepts Reinforcement Capacity Design Distributed Generation 400/275kV 11kV 11kV 6.6kV 400V 400V

  9. STP Module 5 Distributed Generation 2006/07 MEMBER COMPANIES CE Electric Central Networks EDF Energy Electricity Supply Board Networks Manx Electricity Authority ScottishPower Scottish & Southern Electricity United Utilities Co-ordinator: EA Technology

  10. Metering Fault Level Stability Protection Voltage Control Security of Supply Earthing Quality of Supply Module 5 - Distributed Generation Key issues

  11. STP Module 5 Distributed Generation ↓ Networks for Distributed Energy Resources FUNDED BY MEMBER COMPANIES MODULE STARTED IN YEAR: 1997/08 BUDGET FOR THE YEAR 2006/07: €400000 Co-ordinator: EA Technology

  12. Module 5 – 2006/07 Module Title “Networks for Distributed Energy Resources” Addition to Module Scope Moving to lower carbon network designs and the development and operation of distributed resources, the following are within scope: • Network design, distributed generation, demand-side management, storage and active network management • Implications for distribution networks of the Government’s low-carbon strategy Approved in January 2006

  13. Module 5 Objectives • To facilitate increased understanding between all participants on technical and commercial and regulatory issues and develop effective solutions to these issues • To ensure that all participants optimise networkdesign, financial and operational performance as the levels of storage, managed-demand and distributed generation increase on the distribution networks • To maximise the opportunities to the module participants arising from active network management and low-carbon networks, with regard to network reinforcement and network security • To reduce the costs associated with network connection

  14. Module 5 project stages running in September 2006 DG = Distributed generation DNO = Distribution Network Operator Planned dates for large multi-stage projects: S5147 “Microgenerator clusters” Feb 2006 - April 2008 S5149 “Active voltage control” Jan 2006 - July 2008

  15. S5147 Micro-generator Clusters • S5140 Domestic Combined Heat & Power Potential (Sep2004) concluded that short term impact of dCHP on a national scale will be small - but clusters of dCHP units (e.g. a whole new build housing estate) could have significant impact locally (e.g. networks coping with new situations such as reverse power flow) • Lovell Homes are building ~500 homes on a brown field site in Manchester. All houses will have 1kW WhisperGen CHP units supplied by Powergen • S5147 is a more complete study of the effects of dCHP clusters on load and voltage profiles providing real measured data for low voltage network design with microgeneration - to be written into a national Engineering Recommendation

  16. WhisperGen in the home

  17. S5149 Active Voltage Control The objectives of the project are: • To understand the technical and commercial advantages and disadvantages of voltage control equipment when connecting different types of DG • To understand how different types of DG and AVRs can aid voltage profile on an electricity distribution network DG = Distributed Generation AVR = Automatic Voltage Regulator

  18. Stage 3 workshop • STAGE 4 Evaluation and comparison of different voltage control schemes on simplified network. Simplified Network incorporating key issues. Comparison guide. Real case studies Trial of most appropriate schemes on real case studies Recommendations for field trials S5149 Active Voltage Control • Stage 2 Interim report delivered November 2005 • Stage 3Review workshop held December 2005 • Stage 4 Desktop studies of real case studies & potential voltage control solutions – in progress

  19. 21 > 24 MAY 2007 VIENNA AUSTRIA Papers on both ongoing large projects are expected to be chosen for presentation/publication at the CIRED Conference (Session 4: Distributed Generation) - S5147 “Microgenerator clusters” - S5149 “Active voltage control”