An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Database recovery

  2. Database Recovery • Mechanism for restoring a database quickly and accurately after loss or damage • RESPONSIBILITY OF ????? • Recovery facilities: • Backup Facilities • Journalizing Facilities • Checkpoint Facility • Recovery Manager

  3. Back-up Facilities • A DBMS COPY utility that produces a backup copy (save) of the entire database or a subset of the database • Backup: not only the database files but also related database objects (repository, database indexes, source libraries, etc) • Periodic backup (e.g. nightly, weekly) • Backups stored in secure, off-site location • Backup copy-used to restore the database • Cold backup–database is shut down during backup • Hot backup–selectedportion is shut down and backed up at a given time • Incremental backups: record changes made since the last backup • Differential backups: record changes made since the last full/normal backup • the differences since the last full backup.

  4. Back-up Facilities • Database downtime can be very expensive • The lost revenue needs to be balanced against the cost of additional technology, primarily disk storage, to achieve a desired level of availability • To achieve: some DBMS automatically make backup copies in real time. • Stored in on separate disk drives

  5. Back-up Facilities Source: http://www.qadit.com/blog/?p=283

  6. Source: http://kb.acronis.com/content/1536

  7. Source: http://kb.acronis.com/content/1536

  8. Source: http://kb.acronis.com/content/1536

  9. Journalizing Facilities • Audit trail of transactions and database changes • In the event of failure: consistent database state can be reestablished using the information in the journals together with the most recent complete backup • Two basic journals or logs: • Transaction log–record of essential data for each transaction processed against the database • Transaction code, action, time, terminal no/user ID, input data values , tables/records accessed & modified and the old & new field values. • Database change log–images of updated data • Before-image–copy of a record before modification • After-image–copy of a record after modification Produces an audit trail

  10. Database audit trail From the backup and logs, databases can be restored in case of damage or loss

  11. Checkpoint Facilities • A facility by which the DBMS periodically refuses to accept new transactions. The system is in a quiet state and the database and transaction logs are synchronized • All transactions in progress are completed and journal files are brought up-to-date • DBMS writes a special record (checkpoint record) to the log file: snapshot of the state of the database • Checkpoint record contains information necessary to restart the system • Any dirty data blocks (pages of memory that contain changes that have not yet been written out to disk) are written from memory to disk storage • Automatically or response to commands in user application programs This allows recovery manager to resume processing from short period, instead of repeating entire day

  12. Recovery Manager • A module of the DBMS that restores the database to a correct condition when a failure occurs and then resumes processing user requests. • Type of restart used depends on the nature of failure.

  13. Recovery and Restart Procedures • Disk Mirroring–switch between identical copies of databases • Restore/Rerun–reprocess transactions against the backup • Transaction Integrity–commit or abort all transaction changes • Backward Recovery (Rollback)–apply before images • Forward Recovery (Roll Forward)–apply after images (preferable to restore/rerun)

  14. Disk Mirroring • Database must be mirrored  switch to an existing copy of the database • 2 copies of the database must be kept & updated simultaneously • Media failure occurs: processing switch to the duplicate copy • Allows fastest recovery Recovery and Restart Procedures

  15. Restore/Rerun • Involves reprocessing the day’s transactions (up to the point of failure) against the backup copy of the database • Database is shut down • The most recent copy of the database /file to be recovered is mounted • All transactions that have occurred since that copy (stored on the transaction log) are rerun Recovery and Restart Procedures

  16. Restore/Rerun • Advantage: • Simplicity • DBMS does not need to create a database change journal & no special restart procedures required • Disadvantages: • Time to reprocess transactions may be prohibitive • Processing of new transactions delayed until recovery completed • Sequencing of transactions will often be different from when they were originally processed: may lead to different results. • Original Run: customer deposit may be posted before withdrawal • Rerun: Withdrawal transaction may be attempted first. • Last resort in database processing Recovery and Restart Procedures

  17. Backward Recovery (Rollback) • DBMS backs out of or undo unwanted changes to the DB – before images captured • Reverse the changes made by transactions that have aborted or terminated abnormally • Example: transfer 100 from account for cust A to cust B • Program reads the record for customer A and subtracts 100 from the acc balance • Program reads the record for customer B and adds 100 to the acc balance. • Program writes the updated record for A to the dbase. • In attempting to write the record for B, program encounters an error condition and cannot write the record. • An UNDO command – recovery manager to apply the before image for record A to restore acc balance to its original value. Recovery and Restart Procedures

  18. Basic recovery techniques Rollback Recovery and Restart Procedures

  19. Forward Recovery (Roll Forward) • A technique that starts with an earlier copy of the database. After images are applied to the database and the database is quickly moved forward to a later state. • Much faster than Restore/Rerun: • The time consuming logic of reprocessing each transaction does not have to be repeated • Only the most recent after-images need to be applied. DB record may have series of after image – most recent (good) after image is required for rollback Recovery and Restart Procedures

  20. Basic recovery techniques Rollforward Recovery and Restart Procedures

  21. Transaction Integrity • Integrity of transactions: DB is updated by processing transactions that results in changes to one or more DB records • When processing transactions, DBMS must ensure that the transactions follow four well-accepted properties – ACID • Atomic • Consistent • Isolated • Durable Recovery and Restart Procedures

  22. Transaction Integrity • To maintain transaction integrity – DBMS must provide facilities for the user or application program to define transaction boundaries – logical beginning and end of transaction. BEGIN TRANSACTION . . UPDATE INSERT . . COMMIT Recovery and Restart Procedures

  23. Database Failure Responses • Aborted transactions • Preferred recovery: rollback • Alternative: Rollforward to state just prior to abort • Incorrect data • Preferred recovery: rollback • Alternative 1: rerun transactions not including inaccurate data updates • Alternative 2: compensating transactions • System failure (database intact) • Preferred recovery: switch to duplicate database • Alternative 1: rollback • Alternative 2: restart from checkpoint • Database destruction • Preferred recovery: switch to duplicate database • Alternative 1: rollforward • Alternative 2: reprocess transactions

  24. Disaster Recovery (New) • Contingency plans to cater for disasters – destroy/damage data center • Natural disasters • Planning for DR • Develop a detailed DR plan • Schedule regular test of plan • Choose multi-disciplinary team to carry out plan • Fast backup data center – off site location • Send back up copies to backup data center

  25. Contingency Plan • Contingency plan is established to deal with unusual events that are not part of the normal daily routine • Contingency plans detail the response necessary to deal with the types of event that may occur • A contingency plan should include : • who the key personnel are and how they can be contacted • if the key personnel are unavailable, a list of alternative personnel and how they can be contacted • who decides that a contingency exists and how that is decided • the technical requirements of transferring operations elsewhere • the operational requirements of transferring operations elsewhere • any outside contacts who may help • whether any insurance exists to cover the situation