An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Emergency Response & Disaster Management Plan PETRONET LNG LIMITED Dahej S.VENUGOPAL, Manager(HSE)

  2. Petronet LNG is India's first LNG Terminal at Dahej

  3. LOCATION OF DAHEJ

  4. FACTORY LAYOUT N ECC2 ECC 1 Petronet North Gate (Main Gate) T 104 T 101 T 102 T 103 TLF Petronet South Gate FACTORY BOUNDARY JETTY

  5. Emergency Control Centre (ECC-1)

  6. Emergency Control Centre (ECC-2)

  7. EMERGENCY RESPONSE TEAM (ERT) 3.5.1 Control Room panel operator 3.5.1.1 Plant operator 3.5.2 Chief Incident Controller (CIC) 3.5.3 Site Incident Controller (SIC) 3.5.4 Fire & Rescue Coordinator 3.5.5 Medical Coordinator 3.5.6 Security Coordinator (Evacuation and Traffic control) 3.5.7 HSE Coordinator 3.5.8 Gas Monitoring Coordinator 3.5.9 Communication Coordinator 3.5.10 Transport & Logistics Coordinator 3.5.11 Demolition & Reconstruction Coordinator 3.5.12 HR & Welfare Services Coordinator (Relief & Rehabilitation) 3.5.13 Public Relation and Mass Media Coordinator 3.5.14 Technical Coordinator 3.5.14.1 Operations Coordinator 3.5.14.2 Port Operations Coordinator (In Case of Port operation emergency) 3.5.14.3 Maintenance (Electrical, Mechanical & Instrument) Coordinator 3.5.15 Recorder 3.5.16 Messenger

  8. COMMUNICATION SYSTEM Automatic Fire Gas Spill Detection System Automatic Smoke and Heat Detection System Manual Call Points (MCP) Portable Radio sets (Walkie Talkie) Public Address System Paging System Telephones Emergency Sirens Messengers

  9. Mutual Aid Support Petronet LNG Ltd. Reliance Industries Ltd. Gujarat Alkalies & Chemicals Ltd. Hindalco (Aditya Birla Copper) Gujarat Chemical Port Terminal Company Ltd. ONGC (C2-C3 extraction plant)

  10. Approach Route to Plant Route MAP to Petronet LNG Sarasawati Township DMC C/R Welspun GACL Birla Copper GFL GCPTCL Adani Petronet RIL Petronet LNG ONGC C2C3

  11. Rehabilitation Center Rehabilitation Camp Route Lakhigaon School GCPTCL Plant RIL Rehabilitation from Adani Petronet & Lakhibaba temple Adani Petronet Luwara School ONGC C2-C3 Plant Rehabilitation Center Assembly point PLL south gate

  12. Fire Tender & Ambulance Route Route to PHC Dahej GCPTCL Plant Lakhigaon School Emergency Vehicle From Bharuch & near by factory Emergency Vehicle From GCPTCL Adani Petronet Luwara School ONGC C2-C3 Plant

  13. Emergency Coordinator Team Approach route & Car Parking Lakhigaon School GCPTCL Plant Emergency Vehicle From Bharuch & near by factory Emergency Vehicle Form GCPTCL Adani Petronet Luwara School ONGC C2-C3 Plant Car Parking

  14. OFF SITE EMERGENCY DRILL19.02.2010

  15. OFF SITE EMERGENCY DRILL Scenario: Leakage of LNG at TLF Skid from 4” LNG tanker feed pipeline at the upstream side of MOVP 13001. Location: Truck Loading Facility (TLF) Date & Time: 19.02.2010

  16. Location of LNG Leak in TLF area N Petronet Main Gate Petronet South Gate T 101 TLF Area FACTORY BOUNDARY

  17. Main Control Room (ECC-1)

  18. Main Control Room (ECC-1) in action

  19. Emergency Control Centre (ECC-2) in action

  20. Regular Updation of Situation in ECC-2

  21. Assembly Point

  22. Fire fighters in action at site

  23. Fire Fighters in action

  24. Rescuers in action

  25. Observers at site

  26. External Observers outside the plant

  27. Medical Team in action

  28. Medical Team in action

  29. Mutual Aid Fire Tender Arrival

  30. Mutual Aid Ambulance Arrival

  31. Mutual Aid Support Team arrival

  32. District Level Mutual Aid Support

  33. Gas Monitoring Team in action

  34. Gas Monitoring

  35. Evacuation

  36. Evacuation

  37. Evacuation completed

  38. Evacuation

  39. Transportation to rehabilitation camp

  40. Transportation of persons to camp

  41. Vehicle Entering Rehabilitation Camp

  42. Rehabilitation Camp - Luwara

  43. Rehabilitation Camp - Luwara

  44. Rehabilitation Camp - Luwara

  45. Rehabilitation Camp - Luwara

  46. Ambulance in Rehabilitation Camp

  47. First Aid Centre in the camp

  48. Final Debriefing Meeting

  49. THANK YOU