1 / 41

TPC INTEGRATION & SERVICES

TPC INTEGRATION & SERVICES. Participants: S. Evrard/EST D. Gabriele /EST R. Gregory/EST F. Hahn /EP S. Haider /EP S. Maridor/EST Meuller /ST L. Leistam/EST M. Pimenta dos Santos /ST P. Szymanski/EP. Mini Space Frame Back Frame Cooling Systems Cables Gas Systems

adonia
Télécharger la présentation

TPC INTEGRATION & SERVICES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TPC INTEGRATION & SERVICES Participants: S. Evrard/EST D. Gabriele /EST R. Gregory/EST F. Hahn /EP S. Haider /EP S. Maridor/EST Meuller /ST L. Leistam/EST M. Pimenta dos Santos /ST P. Szymanski/EP Mini Space Frame Back Frame Cooling Systems Cables Gas Systems Items Requiring Urgent Attention TPC Collaboration Meeting

  2. MINI SPACE FRAME Original concept Access Now more detail TPC Collaboration Meeting

  3. TPC Collaboration Meeting

  4. TPC Collaboration Meeting

  5. TPC Collaboration Meeting

  6. TPC Collaboration Meeting

  7. TPC Collaboration Meeting

  8. TPC Collaboration Meeting

  9. TPC Collaboration Meeting

  10. TPC Collaboration Meeting

  11. BACK FRAME General Layout Access ROC Installation tool TPC Collaboration Meeting

  12. TPC Collaboration Meeting

  13. TPC Collaboration Meeting

  14. TPC Collaboration Meeting

  15. TPC Collaboration Meeting

  16. TPC Collaboration Meeting

  17. COOLING Work package & Units Detailed design Installation schedule Cost estimates TPC Collaboration Meeting

  18. TPC Collaboration Meeting

  19. TPC Collaboration Meeting

  20. TPC Collaboration Meeting

  21. TPC Collaboration Meeting

  22. TPC Collaboration Meeting

  23. TPC Collaboration Meeting

  24. TPC Collaboration Meeting

  25. TPC Collaboration Meeting

  26. TPC Collaboration Meeting

  27. CABLES Low Voltage High Voltage Control & Read-out TPC Collaboration Meeting

  28. CABLES (LV) TPC Collaboration Meeting

  29. CABLES (LV) Cont. * 40m length TPC Collaboration Meeting

  30. TPC Collaboration Meeting

  31. CABLES (LV) Cont. Companies recommend Cables outside L3 magnet & Bus Bars inside (economic reasons) Heat dissipation from Bus Bars a worry (cooling will be necessary) TPC Collaboration Meeting

  32. TEMPERATURE (0.18) TPC Collaboration Meeting Anna Mueller ST/CV

  33. VELOCITY FIELD (0.18) TPC Collaboration Meeting Anna Mueller ST/CV

  34. TEMPERATURE (0.24) TPC Collaboration Meeting Anna Mueller ST/CV

  35. CABLES (HV) 100kV on both RB24 & RB26 sides HV (FEE ?) both sides Control cables for HV both sides TPC Collaboration Meeting

  36. CABLES (control) DDL Cal. Pulser Gating Pulser Temperature sensors Clock/Trigger DCS/Profibus Other? TPC Collaboration Meeting

  37. GAS STSTEMS Work packages Limits of supply Construction of units has commenced Testing with dummy load May 2003 TPC Collaboration Meeting

  38. WORK PACKAGES Mixing,circulation,purifier & CO2 separation units (GWG) Primary supplies & interconnecting pipework (EST/GDS) Integration (ALICE Team) GOOFI unit (???) TPC Collaboration Meeting

  39. LIMITS of SUPPLY Up to a flange on the distribution manifold (front face of the TPC Field Cage) Flange Flexible Field cage Pipe from GOOFI unit Manifold Limit of supply TPC Collaboration Meeting

  40. SYSTEM TESTS Starting Spring 2003 In SGX2 With 90m3 dummy load Is it required to test TPC before lowering to UX25? If so where? TPC Collaboration Meeting

  41. ITEMS REQUIRING URGENT ATTENTION LV Cable Cooling ROC Insertion Tool TPC Collaboration Meeting

More Related