An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bog Turtle Coordination & Review Protocols – June 18, 2008

  2. Bog Turtle Coordination & Review Protocols • Big News – Franklin County has been deleted from the list of known counties of occurrence for the species

  3. Bog Turtle Coordination • Procedure applicable in its 14-county range (see SOP) • USFWS clearance letter issued or Corps “no effect” determination – no further coordination, PASPGP-3 may be issued • If no wetlands impacted – PASPGP-3 may be issued • If no clearance letter and wetlands are impacted, then follow process for either: • GP 5-9 and 11 and PADEP Individual Permits numbered E-999x, or • E and D permits and EAs

  4. Bog Turtle Coordination – GPs 5-9 and 11 and PADEP Individual Permits numbered E-999x • PNDI • Must be conducted before registration • Linear projects require separate screening for each crossing • If potential conflict, information is sent to USFWS • If a direct hit has occurred, USFWS will advise inquiring agency or applicant on how to proceed • If no direct hit, screening process for potential habitat will be followed

  5. Bog Turtle Coordination – GPs 5-9 and 11 and PADEP Individual Permits numbered E-999x (cont.) • Screening Process for Potential Habitat • If wetlands are not present within the permit area, PASPGP-3 can be issued • If wetlands are present within the permit area and work directly or indirectly affects wetlands • Applicant will contact agency POC or consultant (preferred) to conduct a Phase 1 (habitat) survey • Phase 1 findings provided by a consultant must be reviewed by the Corps or USFWS • Trained agency personnel may make the habitat determination (but it may take longer)

  6. Bog Turtle Coordination – GPs 5-9 and 11 and PADEP Individual Permits numbered E-999x (cont.) • Screening Process for Potential Habitat (cont.) • The Corps will conduct Phase 1 surveys primarily for “Mom ‘n’ Pop-type” projects. • For larger projects, e.g., residential and industrial developments, highway project, etc., the applicant will be encouraged to hire a qualified consultant to conduct the Phase 1. • Phase 1s conducted by a “Qualified Bog Turtle Surveyor” will generally get a quicker review by USFWS than those conducted by other consultants.

  7. Bog Turtle Coordination – GPs 5-9 and 11 and PADEP Individual Permits numbered E-999x (cont.) • If agency investigator determines no habitat, GP can be registered • If agency investigator determines potential habitat, consultation with USFWS is required • USFWS may require a Phase 2 (Bog Turtle presence/absence) survey • Phase 2 surveys must be reviewed by USFWS • No turtles found and USFWS concurs, GP can be registered and PASPGP-3 can be attached • If turtles found or USFWS does not concur, then further consultation is necessary

  8. Bog Turtle Coordination – GPs 5-9 and 11 and PADEP Individual Permits numbered E-999x (cont.) • If turtles are not found and: • USFWS does not concur with the Phase 2 or, • the quality of the wetland appears to be suitable (good) Bog Turtle habitat, the size is relatively large (> 2 acres), and/or the vegetation is dense (i.e., hard to survey) then further consultation is necessary. • USFWS may request a Phase 3 trapping survey (a draft protocol is being developed).

  9. Bog Turtle Coordination – GPs 5-9 and 11 and PADEP Individual Permits numbered E-999x (cont.) • Registration will not occur until PADEP or CCD receives notification that: • The permit area has no suitable habitat, • The permit area is not occupied by Bog Turtles (based on Phase 2 survey), or • No adverse affects to the turtle will result as determined by USFWS or a “no effect” determination by the Corps • If Bog Turtles are located, then further consultation under Section 7 is required

  10. Bog Turtle Coordination – Water Obstruction and Encroachment and Dam Permits (E and D permits) and Environmental Assessments (EAs) • Category III activity • PNDI required • No potential conflict, Corps may: • Make “no effect” determination (if no wetlands or Phase 1 by agency personnel finds no habitat), or • Require a Phase 1 by a consultant (can be submitted to Corps for determination) • If potential conflict, USFWS will be contacted to determine direct “hit”: • If no direct “hit,” Corps may: • Make “no effect” determination (if no wetlands or Phase 1 by agency personnel finds no habitat), or • Require a Phase 1 by consultant • If direct “hit,” further consultation with USFWS

  11. Unauthorized Work in Potential Habitat • After-the-fact permits and restoration further impacting wetlands shall be coordinated with USFWS • Restoration not impacting wetlands does not require coordination with USFWS

  12. Additional Information for ESA Coordination • Additional endangered species review is not necessary where PADEP has received a permit application with an up-to-date (1 year): • “No effect” letter, or • “Not likely to adversely affect” letter