1 / 5

Discussions on Workdose Planning

PSB H- Injection - Design Technical Meeting – 3 rd July 2013. Discussions on Workdose Planning. Radiation Protection Assessment: Objectives. From RP presentation (R. Froeschl) @ H0/H- Dump Review. Design Beam Parameters : 2% of 1e14 proton pulses (160MeV, over 4 dumps).

alima
Télécharger la présentation

Discussions on Workdose Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PSB H- Injection - Design Technical Meeting – 3rd July 2013 Discussions on Workdose Planning Marco Garlasché

  2. Radiation Protection Assessment: Objectives From RP presentation (R. Froeschl) @ H0/H- Dump Review Design Beam Parameters: 2% of 1e14 proton pulses (160MeV, over 4 dumps) Presentation RF (@17/04/2013) 2mSv per person/intervention/year Marco Garlasché

  3. Radiation Protection Assessment: Conclusions • (Dose on coils can be tolerated) Review definition of WDP Bakeout SiC preferred SiC chosen as baseline Design Issues (plug-in) • Optimize design: • Shielding at intervention positions • Shielded container for BSW4 transport Note taken for design Marco Garlasché

  4. Radiation Protection Assessment: WD Planning WDP (@17/04/2013) Marco Garlasché

  5. Radiation Protection Assessment: WD Planning What do we need? • General recurrence values to be reviewed. Are they accepted by all? • Baseline design (*): • Evaluation by EN/HE of BSW4 transport time (with shielding box) • Alignment: • 1 or 2 persons? • check and complete re-alignment of magnets have same time • Alignment of chamber missing/not needed • Update of task times / interventions? • What about other sectorization proposals? • Task times / interventions • definition of new locations WDP (@17/04/2013) (*) SiC, no bake-out, Plug-in system, current sectorization Marco Garlasché

More Related