1 / 21

INFN Site Report

INFN Site Report. Michele Michelotto. INFN new statute. The Research Ministry requested all the research agencies to present a new statute Management frozen at the natural expiration of the mandate until the formal approval

alina
Télécharger la présentation

INFN Site Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INFN Site Report Michele Michelotto

  2. INFN newstatute • The ResearchMinistryrequestedall the researchagenciestopresent a newstatute • Management frozen at the naturalexpirationof the mandate until the formalapproval • President, Management Board, CouncilofDirectors, ScientificCoordinators, RepresentativesofPersonnel

  3. INFN President • Fernando Ferroni • FromRomeUniversity • L3, Babar, Cuore • Designatedby the CouncilofDirectors in October

  4. Rep. ofPersonnel • Roberto Gomezel • INFN Trieste • Wellknow in the HEPiX community

  5. SuperB • High intensity e+e- collider @ Y(4S) energy = 10.58GeV • Open window on newphysicsthrough: • Interferenceeffects in knownprocesses • Observationofdecayswhich are rare or forbidden in the Standard Model • MachineParameters • Tworings, 1258 m in length, crossing at an angle (60mrad). • Nominalluminosity 1036 cm-2 s-1 (x100 existingB-Factories). • Makesuseofcrab-waisttechniquetoimproveluminosity and beamstability. • Re-use, Re-cycle • MakeuseofmanycomponentsfromBabar and PEP-II • SynergieswithItalianInstituteofTechnology • Synchrotron light beamlinesfor material science and biologyresearch.

  6. SuperB • 100 times the data of Babar and Belle

  7. Cabibbo Laboratory • SuperB is an international collaboration spearheaded by INFN • Defined as Flagship project by Italian Minister of Research • France, UK, US, Canada, Poland, Russia, Spain, (Germany, China) • A newly formed laboratory, the CabibboLab, will manage the construction and operation of the accelerator and experiment • Initially a consortium of INFN and University of Rome Tor Vergata. • It will evolve in a European Resarch Infrastructure Consortium with full partner participation • Funding has been approved by the Italian Governement • MoUs in negotiation with international partners • Experiment Collaboration has formed • Technical Design Report expected in 2012.

  8. Nicola Cabibbo 1935-2010 • The C in the CKM matrix • Cabibbo–Kobayashi–Maskawa, the quark mixing matrix • INFN Presidentfrom ‘83 to ‘92

  9. Possible layout @ Tor Vergata

  10. SuperB Computing • Needfor state of the art technolgies • GridDistributedComputing • Parallelcomputingfor Lattice QCD calculations • High speednetworking • Exploitationofmany-coreCPUs and GPUs • High performance data accessbased on solid state data cache • Virtualization and cloudcomputingforsharedusedofdistributedresources • Low environmental impact computingcenters design.

  11. AMS • The AlphaMagneticSpectrometerExperiments • INFN + NASA • Externalmoduleof ISS (International Space Station) since May 19th

  12. AMS • An experiment to search in space for dark matter, missing matter & antimatter on the international space station. • 40 GeV Carbon nucleus and 20 GeV electron • 10 Mbps downlink to CERN control center (Prevessin)

  13. CCR • Computing and NetworkingCommittee • FundingofComputing and NetworkingInfrastructure • Interface withINFNGrid and HENP Experiments • PromotesWorkingGroups, e.g. HEPiXparticipation • Chairedby Prof. M. Paganoni

  14. Tier1 at CNAF - Bologna • 120 racks in twocomputing room: 1000 m2 total • 1100 MW (700 for computing, 400 for cooling) • CPU • 82000 HS06 in Q311 • 105000 HS06 sinceOctober – tender in November for 2012 espansion • Disk Storage • 9 PB in 2011 + 1.6 PB beginningof 2012 (+1.4 PB later) • Tape Storage • 10 PB online  14 PB during 2012 • Network • 3 x 10 Gbps on WAN

  15. Tier2

  16. IGI • ItalianGridInitiative • The National GridInitiative and part of EGI (EuropeanGridInitiative • 54 sites, 14K cores, 5PB of Disk storage, 5 PB ofTape storage, 1100 users, 50 VO, 13kjob/y • INFN is the implementingagency

  17. GARR • The Italian NREN • Most link are 1 Gbps only few link at 10 Gbps • New GARR-X based on • 10 Gbps technology, • Heavy use of dark fiber  DWDM • Lamba switching • Optical and Electro switching • 40 or 100 Gbps Ethernet on 1500 km links

  18. GARR

More Related