1 / 21

Bingay Metallurgical Coal Project 滨盖冶金煤项目

Bingay Metallurgical Coal Project 滨盖冶金煤项目. Centermount Coal Ltd. 加拿大中山焦煤有限公 司 Office Suite 1385 1095 West Pender St. Vancouver BC V6H 2N7 Tel : 604-568-3388 Vancouver , Canada 温哥华,加拿 大 Oct . 2013 年 10 月. Project Location 项目位置.

alissa
Télécharger la présentation

Bingay Metallurgical Coal Project 滨盖冶金煤项目

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bingay Metallurgical Coal Project滨盖冶金煤项目 CentermountCoal Ltd. 加拿大中山焦煤有限公司 Office Suite 1385 1095 West Pender St. Vancouver BC V6H 2N7 Tel: 604-568-3388 Vancouver, Canada 温哥华,加拿大 Oct. 2013年10月

  2. Project Location 项目位置 • The Bingay Main Asset is located in the southeast corner of B.C., in the East Kootenay portion of the Rocky Mountain coal field, covering 11.57 sq. km. The Asset is adjacent to Teck Coal’s Fording River Operation, which produces 8 million tonnes of coking coal annually, and is located within the “Coal Enhanced Resource Development Zone” incorporated into the south Rocky Mountain Land Use Plan. • 滨盖主区位于英属哥伦比亚省东南角,落基山脉煤田的East Kootenay 区域。该矿床靠近Teck Coal 的Fording River 矿作业区,年产焦煤800 万吨;同时位于落基山脉南部土地利用规划中的“强化煤炭资源开发区”内。 Chetwynd Cinnabar Peak 朱沙峰 Prince Rupert 加拿大铁路 Prince George 亚伯达省 Bingay Creek 滨盖小溪 太平洋 加拿大太平洋铁路 温哥华 美国

  3. Map of Bingay Areas Main, A, B, and CBingay 主区,A,B,C区地图 • Bingay Main license 100% owned by Center mount • 中山焦煤有限公司拥有100%的滨 盖主区 • BingayABC licences 100% owned by Centerpoint • 中央资源有限公司拥有100%的滨盖ABC • Notice of work of Bingay ABC obtained • 拥有滨盖ABC工作许可 • All licenses are current • 所有的权证都是有效的 • (Centerpoint is the holding company of Centermount • (中央公司为中山公司的控股公司) Bingay A Area 7.50km2 滨盖A区 面积7.5平方公里Coal License Number: 执照号:418200 A Bingay Main 滨盖伊主区 Coal License Number: 执照号:374190 414014 415139 417302 Area 11.57km2面积11.57平方公里 MAIN 主区 • BingayB Area 6.75km2 • 滨盖B区 面积6.75平方公里 • Coal License Number: • 执照号:418201 Teck Fording B C • Bingay C Area 15km2 • 滨盖C区 面积15平方公里 • Coal License Number: • 执照号:418202

  4. Bingay Main Property 滨盖主区 Fording coal operations Figure 1: Map showing Bingay Main coal license location 图1:滨盖主区煤田许可证位置图

  5. BingayMain Property 滨盖主区 Coal seam No. 10 10号煤层

  6. BingayMain Property 滨盖主区

  7. 交通及基础设施完善Infrastructure and Transportation Consideration • Road :Existing major forest service roadway in place, standard upgrading to be completed during project construction 公路 : 当地已有为林区提供服务的公路干道,在本项目施工过程 中将完成对公路的标准升级改造 • Rail & Port: Close to Canadian Pacific Railway which has the capacity for Bingay .Port facilities (Westshore, Neptune) are expected to provide capacity by 2016 to handle the mine production. 铁路和海港 : 临近加拿大太平洋铁路,为滨盖项目提供足够运力。港口设施(西岸和海王星码头) 于2016 年形成足够运力 满足矿区产出。

  8. 交通及基础设施完善Infrastructure and Transportation Consideration Water : Surface runoff from a nearby creek and groundwater removed from the open pit sufficient for the project development 用水 : 附近小溪的地表径流和露天开采过程中排出的地下水足够满足项目发展的需要 Power : Grid power available through a 138 kV transmission line adjacent to the Asset 电力 : 紧邻本资产有一条138 千伏的输电线路连接电网

  9. Geological Coal Resource煤炭地质资源 Prefeasibility study report - August 2012 预可研报告 – 2012年8月 Resource defined from 资源量来自: Excludes seams less than 0.8m and coal below 900m elevation 以上不包含小于0.8米的煤层和海拔900米以下的煤 Huge potential on Bingay A,B & C area 29.25 km2,drill holes show 32 coal seams 滨盖A、B、C面积29.25平方公里潜力巨大,钻孔表明有32个煤层

  10. Geological Coal Resource煤炭地质资源 每个煤层百分比 % of each coal seam Metallurgical Coal Tonnage Total 焦煤吨位总数 141,806,190

  11. Plan view of Bingay Main deposit 滨盖主区矿床平面图 Resource area under review 在研究中的资源区 N 北 Recent coal discovery 近期发现煤 (Norwest, 2012)

  12. Bingay – Resource 滨盖资源 1495m米 海拔 滨盖小溪 1400m米 海拔 Coal bearing layer – open pit resource 含煤层 – 露采矿资源 Open pit wall? 露天矿壁 Moose Mountain sandstone ( 39 degree dip) 穆斯山沙岩层(39度倾斜) 1100m米 海拔 South 南 Underground Resource 地下资源 not to scale 不按比例 900m米 海拔

  13. Mine Production 矿山生产 Open pit life 15 years 露天矿生产年限15年 Underground mining until year 20 地采20年 Raw coal strip ratio approximately 5.5:1 原煤剥采比约为 5.5:1 Target 2 Million clean tonnes per year 目标为每年200万吨精煤 Potential coal on Bingay ABC, possibility of additional open pit mine increasing production 滨盖ABC储量潜力巨大,有可能再增加露天开采的产量

  14. Bingay – Coal Quality 滨盖 –煤质

  15. Bingay – Coal Quality滨盖 –煤质

  16. Bingay EA update – Jan/2013滨盖环评最新情况 – 2013年/1月 • A draft order under section 11 of the EA issued for Bingay in January 环评11号令草案在1月发给滨盖项目 • Canadian Environmental Assessment Agency determined that a federal environmental assessment is required. 加拿大环评办公室确定了本项目需要联邦级别的环境评估。 • During the pre application stage, Centermount have consulted with First Nations and develop a public consultation plan for the approval of the project16 在预申请阶段,中山公司已经征求原著民意见,并且制定出公众意见征询计划 以让本项目得到批准。 • Scope of the proposed project and the assessment, application procedure, First Nation consultation procedures and Public consultation procedures are specified 指定了拟定项目及评估、申请程序、原住民意见和公众意见征求的范围。

  17. Operating Cost 运营成本 Approximately the same as Fording Coal 约和泰克福丁煤矿相同

  18. TeckSecond Quarter Results for 2013泰克煤田2013年上半年报表

  19. Development Timetable 开发时间表 Potential Mining Start in 2016 Q2 2016年第二季度投产

  20. Highlight (要点) This presentation summarises current status at Centermount Coal Ltd.(“Centermount”) Bingay Project (the “Project”). The key parameters of the Project is shown in the following table. 此材料归纳了加拿大中山焦煤有限公司的滨盖主区冶金煤项目的现状。下表是项目的主要参数。 • Project located at high productive coal field surrounded by 5 Teck coal fieldswith well equipped infrastructure 项目位于高产煤区,附近有泰克5个煤田,基础设施完备。 • Open pit life 15 years,target 2 million clean tonnes per year with potential more open pit coal production. 露天矿开发至少15年,年产200万吨精煤,并有潜力未来增加露采年产量。 • An extensive testing has shown that Bingay coking coal with high CSR can meet the coke quality requirement of the large size Blast Furnaces. 全面测试表明滨盖主焦煤较高的CSR值能满足大型高炉对焦炭质量的需求。 • Based on the current coking coal price and the cost of Teck Coal, the potential net profit is $50 per tonne 基于现有的焦煤价格以及泰克的生产成本,潜在的净利润为每吨50加元。

  21. Centermount Coal Ltd.加拿大中山焦煤有限公司 Office Suite 1385 1095 West Pender St. Vancouver BC V6H 2N7 Sept. 2013年9月 Vancouver, Canada Tel: 604-568-3388 Thank you 谢谢

More Related