1 / 11

LHCb space needs

LHCb space needs. LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage and large scale tests. Storage at P8 LHCb urgently needs decent storage space, preferably at P8

ally
Télécharger la présentation

LHCb space needs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHCb space needs • LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage and large scale tests. • Storage at P8 • LHCb urgently needs decent storage space, preferably at P8 • To protect tools and equipment which are currently degrading outside • To fulfill pending requests, LS1 and long term needs • To store the equipment needed for LHCb operation currently in Bldg 156 • To store the DELPHI material from bldg 157, required for dismantling of the experiment. • Estimate: 400 m2, heated, cherry picker access, and crane. • Assembly area for the LHCb upgrade, 900m2. • The building 156 shall be used for the assembly of sub-detectors for the upgrade and large scale tests for the upgrade installation. At present, the space is taken for storage of spare detector parts, handling and access equipment, and occasionally lent to the RD62 and Aegis experiments for their assembly. • Lab in Meyrin site • LHCb needs 2 small labs in Bldg 13/14 for upgrade R&D activities on new Sub-detectors. This has been already discussed and shall be in the pipeline.

  2. LHCb space needs for operation and upgrade E.Thomas, on behalf of the LHCb TC team SPOB June 2012

  3. LHCb facilities @ P8 Storage PX ‘material’ shaft LHCb workshop SG8 Gas building Visitor area Access to UX Meeting room and offices Control room

  4. SX8 PX ‘material’ shaft LHCb workshop Visitor area (15% of the 70000 CERN visitors in 2011) Access control Control room

  5. SX8/visitor area • Visitor area welcomed 15% of the 70000 visitors at CERN in 2011 • The visitor area is shared with access/transport/recreational area. • Major developments foreseen by the end of 2012. • The full VELO spare detector will be displayed. It will be the only place were Visitors will see a full LHC detector. Special display zone will be prepared by LHCb. • 3D movie cinema room will be installed. The room will isolated from the noisy environment. • Short term LS1: The visitor flow is likely to be limited by the lack of space available • Long term >LS1: Control room will be freed (new building) to enlarge the visitor area

  6. Storage areas 1 2 3 2 1 3

  7. Storage areas Courtesy of D.LACARRERE

  8. Office and Meeting room at P8 4 offices 1 meeting room (20-25p) From 2015, 5 offices will be made available in the new CR building

  9. Bldg. 156 • Bldg 156 was used for LHCb detectors assembly • Now it is used • For Support to LHCb operation (spare storage and repair lab) • for R&D LHCb Upgrade • Storage of delicate equipment's. • LHCb needs to free space in bldg 156 for upgrade activities (R&D and detector assembly).

  10. Bldg. 156 New Lab for upgrade SiPM & Optical test bench LHCb detector spares and repair labs PH-Safety Storage LHCb, Aegis, NA62 Assembly of tracker prototype For LHCb upgrade

  11. Summary – LHCb needs • Storage (Long term) • LHCb urgently needs decent storage space, preferably at P8 • To protect tools and equipment which are currently degrading outside • To fulfill pending requests, LS1 and long term needs • To free space in 156 for LHCb upgrade activities (R&D and assembly). • Estimate: 400 m2, heated, cherry picker access, and crane. • Office (LS1) • LHCb needs office space at P8, to host LHCb staff, users, and support group • At least 5 offices (10p) from 11/2012 to 08/2014

More Related