An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DEVELOPMENT OF LARGE SCALE SOLAR ENERGY PROJECTS Seethapathy Chander Chair, Energy Committee Asian Development Bank

  2. CONTENTS CONTEXT OF SOLAR ENERGY DEVELOPMENT RISKS RISK MITIGATION ADB’S POSSIBLE ROLES AND ASSISTANCE

  3. CONTEXT OF SOLAR ENERGY DEVELOPMENTIN ASIA • ENERGY DEMAND • New Demand vs Substitution • ACCESS TO ENERGY • Supply to Remote Locations • ENERGY SECURITY • Relative Costs of Grid Connected Energy • Access to Hydrocarbons • LOAD DEMAND CHARACTERISTICS • Increasing Cooling and Charging Loads Due to Increasing Affluence and Industrialization

  4. RISKS • RISKS • Sponsor Risks • Land Acquisition, Offtake Arrangements • Offtake Creditworthiness • Regulatory • Specification Risks • Government Risks • Public Acceptability – Costs, Procurement Method, Subsidies • Land, Transmission, Water Use • Financier Risks • Overall Project

  5. RISK MITIGATION • LAND ACQUISITION • Best done by Governments • Ensures Specificity of Purpose • Greater Acceptibility by Public • Saves Time • OFFTAKE ARRANGEMENTS • Can be Done by Sponsor, But More Efficient if Done by Government/ Purchasing Utility

  6. RISK MITIGATION • SPECIFICATION RISKS • Need to Specify Insolation Levels to Optimize Site and Obtain Competitive Proposals • However, Long Term Quality Survey Data Not Available in DMCs • Crucial for Project Economics, Especially During the First Few Years • Could be Mitigated Through a Guarantee That Pays Sponsor the Difference Between Specified and Actual For (say) First Five Years of Commercial Operations • Guarantor Could Be Government or Independent Entity

  7. RISK MITIGATION • PUBLIC ACCEPTIBILITY • Current Higher Costs Need to be Explained in Terms of Lower Future Costs • Energy Security • Sharing of Burden Between Regions, Countries • Competitive and Transparent Procurement • Subsidies/ Grants need to be Time Based, Targeted and Explicit

  8. POSSIBLE ADBSUPPORT • PUBLIC SECTOR/ GOVERNMENT • Preparatory Activities • Bid Documentation • Offtake Arrangements • Assistance for Regulatory Reforms • Evaluation of Proposals • Contract Negotiations

  9. POSSIBLE ADB SUPPORT • PRIVATE SECTOR • Small Equity • Long Term Debt • Specification Risk Guarantee • Political Risk Guarantee

  10. THANK YOU