1 / 26

JW Continental LLC

JW Continental LLC. Real Estate Development and Private Business Ventures. JW Continental LLC. About Us. Since it’s founding in 2005, JW continental has been dedicated to helping bridge the gap between East and West in various Global Ventures.

amber
Télécharger la présentation

JW Continental LLC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JW Continental LLC Real Estate Development and Private Business Ventures

  2. JW Continental LLC About Us • Since it’s founding in 2005, JW continental has been dedicated to helping bridge the gap between East and West in various Global Ventures. • We manage over 10 Million in assets in real estate development and private business ventures. Both partners John Zhang and Wen Ling Cheng have extended experience in Real Estate development and investment. • John Zhang has a civil engineering degree from a leading university in China. He has managed, consulted and built numerous industrial and commercial buildings for over 20 yrs. He has recently successfully completed several residential buildings in the California Bay Area. • John Zhang is also in charge of Prestige Kitchen & Bath, a successful remodeling and interior design and construction company that provides cabinetry, countertops, backsplash, tile flooring, and complete redesign services for residential homes, high end condos and developers. • Wen Ling Cheng in charge of real estate marketing and development for the company and has over 20 yrs of experience in real estate management, marketing and investment.

  3. Residential Real Estate • Walnut Creek California – Single Family Residence

  4. Residential Real Estate • Walnut Creek California – Single Family Residence

  5. Residential Real Estate • Walnut Creek California – Single Family Residence

  6. Residential Real Estate • Fremont California – Single Family Residence

  7. Residential Real Estate • Fremont California – Single Family Residence

  8. Residential Real Estate • Fremont California – Single Family Residence

  9. Residential Real Estate • Fremont California – Single Family Residence

  10. Residential Real Estate • Fremont California – Single Family Residence

  11. Residential Real Estate • Fremont California – Single Family Residence

  12. Commercial Real Estate • Pacific Commons Shopping Center

  13. Commercial Real Estate • Pacific Commons Shopping Center

  14. Commercial Real Estate • Pacific Commons Shopping Center

  15. Our Partners • Frank Chiu - President & CEO • Upon retiring from the City and County of San Francisco after 26 years of service in the building code enforcement, including 10 years as the Chief Building Official and Director of Building Inspection Department, in 2005, Mr. Frank Chiu founded Cal Construction & Consulting, a construction management and permit and consulting firm. He has managed and consulted numerous of construction projects including office, retail, restaurant, hotel, residential, multi-family apartment, tenancy in common, and condominium conversion projects through out the San Francisco Bay Area. • As Director of Building Inspection, Mr. Chiu oversaw 285 professional engineers, building, plumbing, electrical, housing inspectors, and the supporting staff who were responsible for enforcing the various building and safety code. Under his direction, the Department processes and approves over 59,000 permits with a total construction valuation of over $2.4 billion annually. During his tenure as Director, he was involved with many intriguing construction projects including the new Giants’ waterfront baseball stadium, the reconstruction of earthquake damaged historic City Hall, and new Main Library, the new Asian Art Museum, the expansion of Moscone Convention Center, and the 310 acre MissionBay project with UCSF campus, housing restaurants, and retails. • In 2002, Governor Gray David appointed Mr. Chiu to the California Architects Board where he served as a Board member for Pine View Housing Corporation, a non-profit organization that provides housing for seniors. • Mr. Chiu is a certified Building Official with International Code Council and a licensed General Building Contractor with State of California. He is a member of International Code Council and California Building Officials.

  16. Conclusion • We are very confident that with our expertise and strong team, we are capable to satisfy requirements of projects in commercial, industrial and residential projects.

  17. Avoiding Construction Claims through Guaranteed Maximum ContractsBy Paul GogulskiSubmitted December, 2002 Guaranteed Maximum Contracts or G-Max are becoming more popular as a corporate vehicle to minimize risk, avoid claims and integrate the diverse interests of a complex project. Not to be confused with cost plus, the G-Max contract is bid exactly the same as lump sum. The contractor assumes the same risk, with a big stipulation: he's willing to share in the savings on the basis of the owner's guarantee of fee and prompt payment of net cost. There's no difference in cost or risk between Lump Sum and Guaranteed Max, but a big difference in results, particularly on the owner's side of the fence. Don't let anyone tell you that G-Max cost more. They don't! In fact, Lump Sum contracts are sometimes converted to G-Max for the same price or less. How do they work? In the following example, the best bid price received from a qualified general contractor for a major renovation is $2.5 million. The owner's budget is $2.2 million, but modifications and changes are anticipated for an additional $500,000 estimated construction costs. Time is of the essence. The project must start immediately. The owner wishes to cut $300,000 from the base contract without changing the scope of work and at the same time control cost of the additions without giving away the $500,000. The contractor already dropped his price on the first round of negotiations and won't budge off his $2.5 million. This project is an ideal candidate for G-Max conversion. The Owner who awards the contract should ask the contractor: "How much fee (or profit) do you want in this project?" (Assume 6 percent). When the contractor states "$150,000," the owner says: "Then what you are saying is that this project's actual cost is $2.35 million. We'll guarantee your fee of $150,000, but we believe you can bring this project in for under $2 million by working with some of our people who know construction. Do you see that as a realistic possibility? " If the contractor answers "Yes," then the owner asks: "Would you then accept a Guaranteed Max contract with the understanding that all costs saved below the $2.35 million will be returned to the owner? " If the answer is "Yes," then you can establish the method of administration. If the answer is "No," then you negotiate a 75-25 or 50-50 split in the savings and ask: "If we guaranteed $500,000 of additional work to the base contract, will you agree to reduce your fee on extras for the first $250,000 of additional work?"

  18. This is just the beginning, there are many possibilities. The yield at the end of the project often exceeds the original objective (in this case $300,000) because the atmosphere has changed from adversarial to partner. With proper controls, and by working with contractors as a team member, it is possible to obtain greater yields on the bottom line than by any other contracting method.G-Max contracts best achieve the owner's objective because a partnership is formed between owner and contractor wherein the owner agrees to reimburse the contractor for actual cost as it occurs, not from a schedule of values. This eliminates the distrust between parties. It also eliminates the contractor's negligence to pay his suppliers and subcontractors because he gets audited monthly. In today's market, this one issue alone will solve a lot of problems and insure both savings and a smoothly running project. The owner plays an active role throughout the entire process. The whole issue of cost is manageable when the savings are shared, rather than negotiated from an adversarial position. When the administration is properly set-up and organized, the benefits are truly amazing. Because every purchase order and invoice received from the contractor is submitted to the owner as backup, and because the owner agrees to cut the time for processing and pay promptly, a positive and successful relationship is assured. Front end loading disappears, so does the haggling with price.

  19. There is another reason for using the G-Max contract system: It is the best vehicle for recovering cost when pricing on extras becomes unreasonable. The fact that owners have tremendous leverage on extras is not often mentioned among users, perhaps because it is a business advantage. Consider once again the outrageous cost for a new door. Assume that the contractor wants $1,500 to cut the hole and install a new door, plus another $50,000 to relocate the 4-inch gas pipe that nobody knew existed. Assume also that the true cost of the piping relocation is only $10,000, but the contractor will not back off his estimate. The work must start and he demands approval. Under lump sum contracts owner's haven't got much choice, but under the G Max system, even if you agree to the $50,000, all you've given away is the difference in fees, or $2,400 instead of $40,000. Once the work is complete and true cost is known, even this can be adjusted. There's a strong incentive here to be honest. Nothing like it exists with any other format. Cost plus contracts claim to be the same, but in reality they do not have any incentive for shared savings or efficiencies. Still another advantage of G-Max occurs when work must start ahead of final drawings. There are often issues that delay completion of the drawings and therefore start of construction. The G-Max format allows owners to minimize risk when proceeding with work ahead of final drawings. It has been my experience to start work on 30 percent completed drawings while obtaining a G-Max price for the entire project based on preliminary drawings and outline specifications. That's an extreme example, but it does happen.The downside also needs stating. G-Max contracts require more work on the owner's part to administer. The main effort involves defining what is cost. And if you are not interested in collecting discounts, obtaining credits for small tools, establishing realistic labor rates, monitoring rentals, and are not really prepared to act as a partner with your contractor in the project, then this program is not for you. Don't try this if you don't have a strong administrator experienced in general contracting. Contractors resent inexperienced owners questioning their decisions, and they certainly aren't eager to have their books audited by anyone they don't trust. Properly set-up and administered however, G-Max contracts are a win-win situation."

More Related