K-3 Modular Classrooms Constructed with Cross Laminated Timber

K-3 Modular Classrooms Constructed with Cross Laminated Timber. REQUEST FOR QUALIFICATIONS FOR Design-Build Services. Project No. 2016-743 Project No. 2016-754. 2016 Supplemental Budget Section 1022. K-3 Modular Classrooms (91000437 )

amyallen
Télécharger la présentation

K-3 Modular Classrooms Constructed with Cross Laminated Timber

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. K-3 Modular ClassroomsConstructed with Cross Laminated Timber REQUEST FOR QUALIFICATIONS FOR Design-Build Services Project No. 2016-743 Project No. 2016-754

  2. 2016 Supplemental Budget Section 1022 K-3 Modular Classrooms (91000437) Give DES the authorization to expedite the construction of (20) K-3 Classrooms on five different School District sites. With Two Separate Design Build Teams • Western Washington Seattle School District Mount Vernon School District Sequim School District • Eastern Washington Wapato School District Toppenish School District Four Classrooms to each district State Building Construction Account-State $ $5,500,000. Total funding

  3. Modular Classrooms • Kindergarten - 3rd grade Classrooms • Standard Classroom is approx. 900 sq. ft. • Restroom included or adjacent to classrooms • Survey & Utilities are part of each site project • Site specific issues addressed in each location • ADA accessible • Must use Cross Laminated Timber

  4. Why - Cross Laminated Timber ? • A cross-laminated timber is a method of construction that uses timber to form load-bearing solid timber wall, floor and roof panels. These are Modular Construction Panels. • Structural openings, such as doors and windows, are incorporated within the panels at the manufacturing plant. • In many cases only insulation and cladding is added to the external face to achieve high standards of thermal performance. • Modular Panels are • up to 40’x10’

  5. Why - Cross Laminated Timber ? The key advantages of CLT modular wood construction: • Wood stores and sequesters carbon, keeping it out of the atmosphere • By replacing structural concrete, masonry or steel with woodwe use less fossil fuel to manufacture • Wood is a renewable, manageable natural resource • CLT has as inherent high standard of airtightness • Construction with CLT is quick, efficient and precise

  6. Why - Cross Laminated Timber ? • Construction time is very fast - services can be installed and finishes applied whilst panel installation continues. • Higher tolerances achievable through prefabrication • Relatively light weight of panels allows reduction in the size of foundations & footings • Avoidance of noise and dusts associated with traditional construction

  7. Why - Cross Laminated Timber ? • Airtightness is easily achievable • Thermal bridging is very much reduced or eliminated entirely • Prefabrication of panels reduces the quantity of waste associated with onsite fabrication • 'Dry' construction prevents moisture from being admitted into the building • Exact dimensions can be provided for custom / non-standard window and door openings, openings can be done in the manufacturing plant prior to shipping • Requires only limited site skills

  8. Cross Laminated Timber Regional suppliers in British Columbia and Oregon, soon to be in Montana. The State of Washington in the future!

  9. Schedule • Statements of Qualification due @ 3:00pm June 1, 2016 • Three Finalist Selected for each side June 1, 2016 • Issue Requests for Proposal June 13, 2016 • Proprietary Meetings with Finalists West Side June 15, 2016 • Proprietary Meetings with Finalists East Side June 16, 2016 • Last Request for Information due from Finalists: West Side June16, 2016 • Last Request for Information due from Finalists: East Side June17, 2016 • Last Addendum Issued West Side June 17th, 2016 • Last Addendum Issued East Side June 20th, 2016 • Proposals Due at 3:00pm West Side June 28th, 2016 • Proposals Due at 3:00pm East Side June 28th, 2016 • Interview with Evaluation Team West Side June 30th, 2016 • Interview with Evaluation Team East Side June 29th, 2016 • Scoring Proposals West Side June 30, 2016 • Scoring Proposals East Side June 29, 2016 • Public Announcement of scores Both Side 10:00am July 1, 2016 • DES Initiates Negotiations with Highest Scoring Proposer West Side July 6, 2016 • DES Initiates Negotiations with Highest Scoring Proposer East Side July 7, 2016 • Contract Award West Side, July 13, 2016 • Contract Award West Side, July 14, 2016 • Notice to Proceed – To Be Determined

  10. Thank you Questions?