An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RADWG 3rd - 201422th May 2014 G. Spiezia (EN/STI/ECE)

  2. AGENDA • Matters arising • Summary of workshop on FPGA • CHARM: update and news • Status report of radiation test campaigns at Fraunhofer • Radiation damage studies at F4E for ITER

  3. RADWG mandate • Working group to share information among accelerator sectors groups dealing with radiation • Presentation and discussion on radiation facilities, test setups and results • Organization of the Radiation Test plan • Out side CERN (PSI, CEA, Fraunhofer and others) • At CERN (CNRAD, H4IRRAD  CHARM) • Communication on calculations and measurements of the radiation levels in the CERN machines • Report of the equipment failure due to radiations and their follow-up Review • Discussion of the mitigation actions • Update/Summary of relevant workshop and conferences

  4. Facilities • Standard facilities • PSI. Proton beam (>15 tests per year) • CEA, Fraunhofer. Displacement damage (3 tests per year) • Fraunhofer. Co60. Total Ionizing dose (blanket contract) • In-house test areas • CNRAD, H4IRRAD (Past) • CHARM • Crucial effort in Coordination and planning PSI PSI PSI Co60 source CEA G. Spiezia EN/STI/ECE

  5. PSI test – Next slots • PIF facility will stop from July to October • http://radwg.web.cern.ch/RadWG/Pages/PSI_tests/2014_PSI.htm

  6. PSI test • MCP1826-Adjustable (BE/BI) • Output stable up to 1kGy • Vin threshold decreases (minor effect) • Opto TLP 127 (TE/EPC) • CTR degradation

  7. PSI test Cypress Toshiba • Cypress on RadMon • Able to distinguish two different flux (6E6 and 1.4E7 p/cm2/s) • Central memories counts more (sample to sample spread??) 5-6 1-2 0-3 0-3 5-6 4-7 4-7 3 2 1 0 7 6 5 4

  8. PSI test • SRAM Cypress CY7C1059 8Mbit • Cross section of ~2.3-3 10-14 cm2

  9. Workshops • AMICSA • Workshop organized by ESA with CERN collaboration • ASICS and mixed signal components • Talks from industries • 30 June-1 July 2014 • http://indico.cern.ch/conferenceTimeTable.py?confId=277669#20140630

  10. Conferences • NSREC 2014 - Paris • Combined with RADECS • July 14-18 2014 • http://www.nsrec.com/ details on the call for papers and the short course program • SEE symposium • 19-22 May • http://radhome.gsfc.nasa.gov/radhome/see_mapld/#

  11. Back-up

  12. Displacement damage tests • Transport of the irradiated material from CEA was completed on December 2013 • IT beacon • Diodes for BLM • Light EN/EL • Reports to be transmitted • Request for 2014 not accepted by CEA • Tests to be organized with other facilities (Fraunhofer)

  13. Fraunhofer institute - Germany • All the information and the news are on the web: https://twiki.cern.ch/twiki/bin/view/FraunhoferRadTests/WebHome

  14. Rad-Tol projects • The list of the projects with R2E concerns was presented last year • Reviews are organized for the project follow-ups; last one was for the Beam Instrumentation equipment http://indico.cern.ch/e/R2E_BI_2013 • List of Rad-tol projects are on the website: • http://radwg.web.cern.ch/RadWG/Pages/Rad-related_projects.htm