1 / 15

S pace C entered R eading of E ar A udibility M easurements

S pace C entered R eading of E ar A udibility M easurements. Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse. PROJECT SCREAM PROPOSAL. 09.23.08. Mission Statement.

annick
Télécharger la présentation

S pace C entered R eading of E ar A udibility M easurements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SpaceCenteredReading of EarAudibilityMeasurements Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse PROJECT SCREAM PROPOSAL 09.23.08

  2. Mission Statement • Ascend to an altitude between 25,000 – 30,000 meters to better understand how sound behaves in near space conditions. • It is a known fact that sound cannot be heard in the vacuum of space because sound waves require a transport medium. • We hypothesize that as our BalloonSat nears the silence of space, sound amplitude will decrease as a function of altitude. • We theorize that a 261.33 Hertz middle C, played at a constant decibel level on ground, will decrease in amplitude as altitude increases and air pressure decreases. • Project SCREAM shall also produce photographic images of the horizon of Earth using the digital camera provided.

  3. Design Concept • DIM: 30cm x 14cm x 14cm • Sound Chamber • Component Placement

  4. Weight Budget

  5. Price Budget

  6. Impact: Stair Test Drop Test Whip Test Systems: Components Test Dry Ice Test Testing

  7. Team Safety • Awareness. • Communication Techniques • Safety Glasses • Gloves • Structural Test Safety (bystanders and team members) • Vigilance Around Sharp Objects and Electric Currents

  8. General Proposal Requirements • All necessary systems such as the HOBO will be on board to take fundamental data readings. • The satellite will stay above zero degrees Celsius because of the on board heater and insulation. • Primary experiment is separate from the on board camera and HOBO data loggings. • Experiment will consist of a sound chamber, a sound emitter, and a sound receiver. • Satellite will be structurally sound so that all the experiments will be performed, logged, and retrieved.

  9. Launch Program • Team SCREAM will be ready to leave with our satellite at 0500 on November 27. • Team SCREAM will arrive at Windsor, Colorado at 0730 ready to launch. • 1.5 hours before the flight team SCREAM will do a systems and structures inspection. • Team SCREAM will then secure the satellite to the balloon by running the rope through the satellite. • A representative from Team SCREAM will hold the satellite in a line with the other satellites and release it when appropriate. • Team SCREAM will then locate the satellite. • Once team SCREAM has found the satellite they will turn off the systems and inspect it to see if there is any structural damage. • Team SCREAM will then secure the satellite in preparation to collect data. • Team SCREAM will eat a well-deserved lunch after a long day of launching and chasing.

  10. Recorder 12 V Battery Recorder Power Switch HOBO Pressure Sensor 9 V Battery 9 V Battery 9 V Battery Timer Switch Speaker Heater External Temp Camera Power Source HOBO Camera Speaker Power Systems Diagram

  11. Team Organization • Joshua Yeaton: Team Leader/Microphone and Speaker Configuration • Kevin Dinkel: Budget Organization/Structures • Dillon Thorse: Structures/Camera • Conrad Schmidt: Soldering/Electrical • Chris Kopacz: Structures/Camera • Chris Warren: Microphone/Speaker Configuration

  12. Team Organization (Cont.) • As all members of the team are aerospace engineering majors with little experience in their respective areas, these designations are somewhat flexible. • If anyone needs help with a specific assigned part of the satellite, the rest of the team will assist as needed.

  13. Schedule • Week 1, 9/15-9/21: All members work on proposal assignments. Presentation construction on 9/21. • Week 2, 9/22-9/28: Proposal due 9/23. Team Presentations 9/23. Complete proposal. • Week 3, 9/29-10/5: HW 05 due 10/02. Complete design for DD Rev A next week. Order hardware. • Week 4, 10/6-10/12: DD Rev A due 10/9. Start construction and begin testing. DD Rev B for next week. • Week 5, 10/13-10/19: DD Rev B due/Presentations due 10/14. Work on prepping for in-class demonstration of hardware. Final design prototyping. • Week 6, 10/20-10/26: Team in-class demonstrations 10/23. Complete building final design. • Week 7, 10/27-11/2: Final Testing. Cold test must be completed. BalloonSat completed on weekend.

  14. Schedule (Cont.) • Week 8, 11/3-11/9: In-class mission simulation 11/4 and 11/6 – BALLOONSATCOMPLETED. LRR Cards due 11/6. DD Rev C due 8:00 AM 11/6. Launch Prep. • Week 9, 11/10-11/16: Final BalloonSat Weigh-in and TURN IN 2:00 PM 11/14. LAUNCH DAY 11/15. LRR Presentations 11/11. Launch prep prior to launch. • Week 10, 11/17-11/23: Bring raw flight data 11/18. Process flight data. • Week 11, 11/24-11/30: Fall Break. Work on final presentation and DD Rev D. • Week 12, 12/1-12/7: DD Rev D Due 12/2. ALL presentations due 12/2. HW 06 Due.

  15. Team SCREAM’s Screamers • Having an audible/recordable sound • Lots of electronics, one heater enough? • Satellite weight, lots of bulky items • Testing, components are tightly packed, no room for movement/error • Recording Altitude?

More Related