1 / 15

UF Telecom Standards Overview ITAC-Network Infrastructure

UF Telecom Standards Overview ITAC-Network Infrastructure. Presented By John Madey Associate Director Computing & Networking Services Telecommunications & Network Infrastructure November 12, 2009. Road Map for Today. Standards background Quick overview Highlights Next Steps. Background.

annis
Télécharger la présentation

UF Telecom Standards Overview ITAC-Network Infrastructure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UF Telecom Standards OverviewITAC-Network Infrastructure Presented By John Madey Associate Director Computing & Networking Services Telecommunications & Network Infrastructure November 12, 2009

  2. Road Map for Today • Standards background • Quick overview • Highlights • Next Steps

  3. Background • Current version dated May 2005 • Used as a starting point for new construction design / major renovations • Addresses physical infrastructure • Structured cabling systems • Information transport systems

  4. Overview • Sections cover major components: • Telecom Rooms • Backbone Cabling • Horizontal Cabling • Outside Plant • Labeling and documentation • Appendix provide additional detail • Tracked variance requests, industry trends and internal review

  5. Highlights • Access to all Telecom Spaces: • Card Access • Page 8

  6. Highlights • Entrance Facility / Main Telecommunications Room/ Telecom Room Backboard: • Use readyspec backboard • Page 8

  7. Highlights • Section 4.0 Telecom Room Size: • 10’ X 12’ space • 5’ X 14’ room with 2 sets of double doors • Stacked • Page 12

  8. Highlights • Section 6.0 Horizontal Pathways: • No “J hooks” for new construction • Use cable tray (conduit stubbed out to tray) • Renovations / existing – some times no choice

  9. Highlights • Section 7.0 WAO (Work Area Outlet): • Use to be 3 cables – 2 data one voice • Now – just 2 cables • Minimum – user needs may add more • Page 18

  10. Highlights • Section 8.0 Backbone cabling: • Intra-building fiber • Page 19

  11. Highlights • Section 9.0 Horizontal Cabling: • Reinforce telecom standards must be followed by other low voltage systems. • Page 22

  12. Highlights • Section 11.0 Deliverables: • Page 27

  13. Highlights • Section 17.0 Blue Light Phones -- NEW • New section • Use Talk-A-Phone products • Appendix – installation detail • Section 18.0 Mass Notification System -- NEW • IP Paging via InformaCast • Indoor / Outdoor IP Speakers • Outdoor Loudspeakers

  14. Next Steps • Review and incorporate feedback from: • Network community • Facilities Planning & Construction • Consulting Engineers • Send out and present to: • FP&C – overview meeting • PPD – overview meeting • Contractors

  15. Contact Info John Madey University of Florida Computing & Networking Services Email: jmadey@ufl.edu Phone: 352.273.1113

More Related