An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workshop & Listening Session NPDES General Permit for Wastewater Discharges from Water Treatment Plants January 13, 2014

  2. Permit History • First Issued Dec 1997 EIA done • Reissued July 2003 30 Permittees • Reissued (eff date) Sept 2009 31 Permittees • To Be Reissued (eff) Sept 2014 Lower: Cl2 Limit Drop: D.O., Temp, THM, Discharge Rate, Volume Add: SWPPP

  3. Permit Violations in 2013 Late DMR 28 Chlorine effluent exceedance 3 Missed sampling 2 Missing O & M Manual 12 Missing Solid Waste Control Plan 15 Missing Spill Plan 15 Missing Stormwater PPP 16

  4. Ecology’s Intent for Sept 2014 General Permit • Stay the course • Reorganize all GPs to make them more consistent • Define terms consistently • Clarify goals of and methods for monitoring • State universal requirements consistently (Chapter 173-226 WAC)

  5. Specific Tweaks • Reorder the terms & conditions • Require electronic applications (eNOI) • Require electronic reporting of monitoring (eDMR) • Fix typos: • Report effluent flows S2C2a vs. S2C3 – Possible contradiction • S3A – “and all other discharges” • S3A – Indicates averaging pH is OK • S4 – Groups 1 & 2 not exhaustive • S5B – Must be 5 years retention • S6B2 – Add “or”

  6. Plan for Re-Issuance 11/8/2013 Send reminder letters to Permittees 1/13/2014 Workshop & Listening Session 3/1/2014 Application Renewal Due Date Early April 2014 Issue Draft Permit: 45-day comment period Early May 2014 Workshop & Public Hearing Mid-July 2014 Issue Final Permit & Responses to Comments 30-day appeal period Sept 1, 2014 Effective Date of Revised Permit

  7. Your Ideas ?