Technical Foundations & Enabling Technologies – DS4. Andrew Faulkner. Remit:. Technical foundations and Enabling Technologies. The Demonstrator is: 2-PAD. Overall. DS4 very broad range with many institutions involved

aram
Télécharger la présentation

Technical Foundations & Enabling Technologies – DS4

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical Foundations &Enabling Technologies – DS4 Andrew Faulkner

  2. Remit: Technical foundations and Enabling Technologies The Demonstrator is: 2-PAD SKADS Workshop 2006

  3. Overall • DS4 very broad range with many institutions involved • Schedule is disrupted – particularly in UK – due to funding delays (funds now awarded) • We will deliver by June 2009 There are 3 more years...... SKADS Workshop 2006

  4. DS4 work schedule 2006 Investigate and consider any possible approach. Blue Sky etc... 2007-Q1 Select 2 or 3 of the most likely approaches 2007 Prototyping and developing phase. Build models, bring together systems 2008-Q1 Select 2-PAD components and finalise 2-PAD design note: individual subsystem work will continue 2008 Build 2-PAD 2009-1H Test 2-PAD and write report Report on advances in subsystem research SKADS Workshop 2006

  5. Risks Low Risk: the components exist, but can be improved.... • Antenna array, needs performance and cost and ease improvement • LNA, the system noise and the cost need to be improved • Processing, currently far to little capacity, but will work at some limited bandwidth High Risk: does not exist... • Low power, low cost high speed ADC • Cheap enough analog links – must be <€5 each • RFI mitigation - unproven SKADS Workshop 2006

  6. Bits • Digitisation is not to do with instrument dynamic range! • It is to do with the RFI environment. • To make a practical all-digital aperture array must use minimal digitisation e.g. 4-bits CANNOT design for a European environment!! We need information from Site surveys First cut suggests that 4-bits is OK...(phew!) SKADS Workshop 2006

  7. 2-PAD System • Consider Station level AA with 2-PAD as a subsystem • Hence understand scaling and processing issues • Distances, cooling, power etc • Station wide construction requirements • Reliability analysis (system layout vital) • Important to have benchmark specification! • Building first model • Focus on the bottlenecks • Possibility/availability of components • Cost SKADS Workshop 2006

  8. Possible Station - Side view SKADS Workshop 2006

  9. Possible Station - Side view Element array 50m x 50m Inflatable Ray dome Short range analogue links from elements to local processing Array physical support grid To scale Entrance Inflation pump Station Proc. Local P. Desert FOV processing + ¼ tile processing 10m x 5m FOV processing + ¼ tile processing 10m x 5m x 2.5m Array supports providing ~1.6m headroom Tile processing for ¼ of array 5m x 5m x 2.5m Cooling system Using heat transfer ground Optical fibre digital links SKADS Workshop 2006

  10. Short range analogue links from elements to local proc (only ¼ shown) Matrix of supports ~2m spacing (625) Local Proc. Local Proc. Inflatable Ray dome Station Layout (looking up) Element array 50m x 50m Optical fibre digital links Entrance Local Proc. Station Processing Wide area fibre link to Correlator Tile processing for ¼ of array 5m x 5m Inflation pump FOV processing + ¼ tile processing 10m x 5m SKADS Workshop 2006

  11. Tile Receiving elements Vert. Pol. Horiz. Pol. Antenna LNA Filter + Differential Line driver +ve Reg Reg Individual PCB Processing centre Low cost screened twisted pair 20m max SKADS Workshop 2006

  12. ‘Tile’ configuration 0 1 2 3 4 5 6 7 12 13 14 15 0 1 2 3 4 5 6 7 12 13 14 15 … element receiver = … … • Notes: • 16 elements / side • Groups of 16 Rx • in a cluster (4x4) • Overall size: • 3.0m square • 9.0m2 • 512 links / tile • (2x16x16) … … … … … … … … … … … … … … … … … … … … … Analogue twisted pair to Processing Centre 4x4 receiver units SKADS Workshop 2006

  13. Overall Station 256 Tile processors 8 (say) FOV processors Assumes 4-bit samples 1GHz signals From each element 600MHz BW FOVs; 8 per tile 256 beams of 600MHz BW per FOV 16 x 16 array of Tiles ~2300 m2 Bunkers TP1 FOV1 TP2 } .. TP3 . TP17 FOV2 TP18 .. TP19 To Correlator ….. ….. ….. ….. FOV8 .. TP254 TP255 32 off 40Gb Optical fibres per FOV polarisation 256 x 8 5-10Gb Optical fibres TP256 256 x 256 1GHz Analog links SKADS Workshop 2006

  14. Final Thoughts.... • Cost dominated by array and analogue links • Total power requirements vital • Power and cost of ADC an issue • Communications for the internal data streams • Continue system design: • Frequency dependant aperture • Calibration approaches • Independent many small beams over whole scan angle • Flexibility on beams/bandwidth/sampling for Tx to correlator On SKA timescales: a digital AA appears: possible, practical and cost effective SKADS Workshop 2006