1 / 17

18 Sep12

NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD. 18 Sep12. Overview. NAVEDTRA policy and process documents NETC N7 policy/process for migration from NAVEDTRA 130/131 to NAVEDTRA 136 for new content development

Télécharger la présentation

18 Sep12

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NETC N7 Status Update to AIM FRBRoy Hoyt, NETC N74LCDR Brewster, NAVMACTiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18 Sep12

  2. Overview • NAVEDTRA policy and process documents • NETC N7 policy/process for migration from NAVEDTRA 130/131 to NAVEDTRA 136 for new content development • NETC N72/NETPDTC Naval Training and Product Services MAC IDIQ contract • Upcoming JDTA projects as candidates for NAVEDTRA 136 / CPM-LO Module efforts • AIM I-II/CPM/LO Module interfaces with ETMDS Atlas Pro • NETC/OPNAV N15 integration of NETC domain/acquisition community business processes

  3. Overview(contd) • OCCSTDS integration into CPM • Import from NOID • OCCSTD to JDTA tab design • Larger NAVMAC OCCSTD development, vetting and publication process in CPM • Issue/status of position specific OCCSTD data for LCS and other “Whole Job” analysis efforts • NODCAM development (Navy Job Analysis Data Management) • Survey Update • QMP Survey tool • Importance of Survey to OCCSTDs • RIS for LAS Portal Update

  4. Promulgated NAVEDTRAs • 130B (Task-Based Learning Content) • 131B (PPP-Based Learning Content) • 132 (Testing) • 133 (HPRR) • 134A (Navy Instructor Manual) • 135C (Schoolhouse Mgmt) • 136 (ILE Learning Content) • 137 (JDTA)

  5. NAVEDTRA Drafts • 138 (FEA) • All NAVEDTRAs currently under revision • Re-engagement with NAVAIR Standards to recommence in FY13

  6. MIL-HDBK-29612 Update • PMA-205 working group chaired by Janet Gilmartin convened in May 2012 • Ongoing comments on 29612 DIDs • Schedule for completion TBD

  7. Naval Education and Training Command Course Development & Revision Process (1 of 2) Trigger Initiating Process Date: 24Jan2012_V1/rh/ko/jtw External Training Requirement Sources: Trigger Initiating Process Training Requirement Identification & Resource Sponsor Commitment NETCINST 1500.9 3 December 2010 NTSP Revision OPNAV N1 Training Requirement Sources Revision to Enlisted Occupational Standard Operational Risk Management (ORM) Assessment Requirement Sponsor Provides Formal Correspondence Identifying Training Requirement Resource Sponsor / Training Support Agent Commits to Resource Training Requirement Fleet Performance Assessment Rating Merger Direct Fleet Input Establishment or Revision of a NEC Human Performance Requirements Review (HPRR) End Process NAVEDTRA 133 Human Performance Requirements Review Management Manual June 2011 Perform Job Duty Task Analysis (JDTA) Develop Business Case Analysis (BCA) Develop Training Project Plan (TPP) Develop New Course or Revise Existing Course and Pilot Deliver Course of Instruction Perform Front End Analysis (FEA) Perform Content Quality Review for Content Re-Use or Re-Purpose Course Development / Revision End - to - End Process NETC Course Development / Revision End - to - End Process Course Development & Revision Process Color Key: NAVEDTRA 137 Job Duty Task Analysis (JDTA) Management Manual July 2011 Front End Analysis (FEA) User Guide NETCINST 1500.6 9 March 2010 NAWCTSD Orlando, FL Quality Evaluation Tool Technical Report 2005-002 June 2005 Business Case Analysis (BCA) Policy NETCINST 1510.3 20 October 2009 NAVEDTRA 130B Task Based Curriculum Development Manual August 2009 NAVEDTRA 135C Navy School Management Manual March 2010 External Training Requirement Sources External Training Requirement Sources Requirement Sponsor & Resource Sponsor Actions NAVEDTRA 131B PPP Based Curriculum Development Manual November 2010 NAVEDTRA 134A Navy Instructor Manual August 2009 OPNAV N1 Training Requirement Sources OPNAV N1 Training Requirement Sources OPNAV N1 Training Requirement Sources NAVEDTRA 136 ILE Course Development & Life-Cycle Maintenance Manual November 2010 NAVEDTRA 132 Navy School Testing Program Management Manual March 2011 Course Development and Revision Process NETC Course Development and Revision Process

  8. Trigger Initiating E2E Process: Naval Education and Training Command Course Development & Revision Process (2 of 2) Date: 24Jan2012_V1/rh/ko/jtw External Training Requirement Sources NTSP Revision * * NAVEDTRA 130B Task Based Curriculum Development Manual August 2009 NAVEDTRA 135C Navy School Management Manual March 2010 Operational Risk Management (ORM) Assessment * * NAVEDTRA 131B PPP Based Curriculum Development Manual November 2010 NAVEDTRA 134A Navy Instructor Manual August 2009 Fleet Performance Assessment * * NAVEDTRA 136 ILE Course Development & Life-Cycle Maintenance Manual November 2010 NAVEDTRA 132 Navy School Testing Program Management Manual March 2011 NAVEDTRA 137 Job Duty Task Analysis (JDTA) Management Manual July 2011 Front End Analysis (FEA) User Guide NETCINST 1500.6 9 March 2010 NAWCTSD Orlando, FL Quality Evaluation Tool Technical Report 2005-002 June 2005 Business Case Analysis (BCA) Policy NETCINST 1510.3 20 October 2009 Direct Fleet Input * * OPNAV N1 Training Requirement Sources Perform Job Duty Task Analysis (JDTA) Develop Business Case Analysis (BCA) Develop Training Project Plan (TPP) Develop New Course or Revise Existing Course and Pilot Deliver Course of Instruction Perform Front End Analysis (FEA) Perform Content Quality Review for Content Re-Use or Re-Purpose Revision to an Enlisted Occupational Standard Course Development / Revision End - to - End Process Rating Merger NETC Course Development / Revision End - to - End Process Establishment or Revision of a NEC Course Development & Revision Process Color Key: Learning Center Change in Work Requirement External Training Requirement Sources Requires NETCINST 1500.9 Submission Course Surveillance * * External Training Requirement Source OPNAV N1 Training Requirement Sources Change in Delivery Method or Performance Standard Formal Course Review Triggers That Could Cause a LC to Conduct a HPRR Human Performance Requirements Review (HPRR) Possible Take-always from a HPRR * Change in Resource Requirement; CDP Addition or Deletion Fleet Feedback NETC Course Development and Revision Process NETC Policy Documents NAVEDTRA 133 Human Performance Requirements Review Management Manual June 2011 Change in Course Length As Directed by the CCA

  9. NETC N7 Policy/Process for Migration from NAVEDTRA 130/131 to NAVEDTRA 136 • NETC INST 1500.10 (13 Aug 12) defining policy: • Any new content development within the NETC domain, for revision of 50 percent or greater of existing content, shall be performed using AIM, CPM , and LOM . Learning Centers (LCs) should strive to convert all course material using AIM, CPM, and LOM as workload permits . A Job Duty Task Analysis (JDTA) is required to be developed in the CPM for all revisions that add new work to a course (tasks ) , new developments, and baselining of an existing course, regardless of the development tool.

  10. NETC N72/NETPDTC Naval Training and Product Services MAC IDIQ contract • Awarded in May 12 – 9 prime vendors • Primary vehicles for NETC Learning Centers to acquire new content and revise existing learning content • Role of CPM/LO Module and interface with CBT authoring tools

  11. Upcoming JDTA projects as Candidates for NAVEDTRA 136 / CPM-LO Module efforts • JDTAs required for all revisions that add new work to a course (tasks) regardless of development tool (AIM I/II/CPM) • New builds within NETC will use CPM/LO Module

  12. AIM I-II/CPM/LO Module Functional Interfaces with Atlas Pro • Atlas Pro LMS: AIM I/AIM II/LO Module now output SCORM 2004 ILT content packages that can be delivered to ECR and tracked via LMS • ROCCE: LO Module now exports to and will import from ROCCE CBT design data and metadata to support integrated development and life-cycle maintenance • Assessment Engine: AIM I/AIM II/LO Module now output test items to Assessment Engine

  13. NETC/OPNAV N15 Integration of Business Processes • OPNAV INST 1500.76 Rev C in development • Update on OPNAV level interest and policy WRT use of NAVEDTRA 137 and 136 (and CPM/LO Module) • NETC N74 working with aviation community (Kelee Plagis of CNAF) on ‘harmonizing’ NAVEDTRA 136-137-138 business process with that in Naval Aviation Training System (NATS) Handbook for NETC domain and acquisition community standardization • ** Will recommence Sep 2012 post NAVEDTRA revisions and Stand-up of OPNAV N9’s

  14. OCCSTDS Support in CPM OCCSTDS integration into CPM Status Import from NOID OCCSTD to JDTA tab design Larger NAVMAC OCCSTD development, vetting and publication process in CPM Issue/status of position specific OCCSTD data for LCS and other “Whole Job” analysis efforts NODCAM development (Navy Job Analysis Data Management) content

  15. Survey Update • QMP Survey tool • Importance of Survey to OCCSTDs • RIS for LAS Portal Update

  16. Questions?

  17. Backup Slides

More Related