An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project ManagementA Managerial Approach Chapter 8 Scheduling

  2. Scheduling • A schedule is the conversion of a project action plan into an operating timetable • It serves as the basis for monitoring and controlling project activity • Taken together with the plan and budget, it is probably the major tool for the management of projects

  3. Scheduling • In a project environment, the scheduling function is more important than it would be in an ongoing operation • Projects lack the continuity of day-to-day operations and often present much more complex problems of coordination

  4. Scheduling • The basic approach of all scheduling techniques is to form a network of activity and event relationships • This network should graphically portray the sequential relations between the tasks in a project • Tasks that must precede or follow other tasks are then clearly identified, in time as well as function

  5. Scheduling • Such networks are a powerful tool for planning and controlling a project and have the following benefits: • It is a consistent framework for planning, scheduling, monitoring, and controlling the project • It illustrates the interdependence of all tasks, work packages, and work elements • It denotes the times when specific individuals must be available for work on a given task

  6. Scheduling • Network benefits (cont.): • It aids in ensuring that the proper communications take place between departments and functions • It determines an expected project completion date • It identifies so-called critical activities that, if delayed, will delay the project completion time • It identifies activities with slack that can be delayed for specific periods without penalty

  7. Scheduling • Network benefits (cont.): • It determines the dates on which tasks may be started - or must be started if the project is to stay on schedule • It illustrates which tasks must be coordinated to avoid resource timing conflicts • It illustrates which tasks may run, or must be run, in parallel to achieve the predetermined project completion date • It relieves some interpersonal conflict by clearly showing task dependencies

  8. Network Techniques: PERT and CPM • With the exception of Gantt charts, the most common approach to scheduling is the use of network techniques such as PERT and CPM • The Program Evaluation and Review Technique was developed by the U.S. Navy in 1958 • The Critical Path Method was developed by DuPont, Inc during the same time period

  9. Network Techniques: PERT and CPM • PERT has been primarily used for research and development projects • CPM was designed for construction projects and has been generally embraced by the construction industry • The two methods are quite similar and are often combined for educational presentation

  10. Terminology • Activity - A specific task or set of tasks that are required by the project, use up resources, and take time to complete • Event - The result of completing one or more activities. An identifiable end state occurring at a particular time. Events use no resources. • Network - The combination of all activities and events define the project and the activity precedence relationships

  11. Terminology • Path - The series of connected activities (or intermediate events) between any two events in a network • Critical - Activities, events, or paths which, if delayed, will delay the completion of the project. A project’s critical path is understood to mean that sequence of critical activities that connect the project’s start event to its finish event

  12. Terminology • An activity can be in any of these conditions: • It may have a successor(s) but no predecessor(s) - starts a network • It may have a predecessor(s) but no successor(s) - ends a network • It may have both predecessor(s) and successor(s) - in the middle of a network • The interconnections depend on the technological relationships described in the action plan

  13. Drawing Networks • Activity-on-Arrow (AOA) networks use arrows to represent activities while nodes stand for events • Activity-on-Node (AON) networks use nodes to represent activities with arrows to show precedence relationships • The choice between AOA and AON representation is largely a matter of personal preference

  14. Drawing Networks

  15. Gantt Charts • The Gantt chart shows planned and actual progress for a number of tasks displayed against a horizontal time scale • It is an effective and easy-to-read method of indicating the actual current status for each set of tasks compared to the planned progress for each item of the set • It can be helpful in expediting, sequencing, and reallocating resources among tasks • Gantt charts usually do not show technical dependencies

  16. Scheduling

  17. Gantt Charts • There are several advantages to the use of Gantt charts: • Even though they may contain a great deal of information, they are easily understood • While they may require frequent updating, they are easy to maintain • Gantt charts provide a clear picture of the current state of a project • They are easy to construct

  18. Summary • Scheduling is particularly important to projects because of the complex coordination problems • The network approach to scheduling offers a number of specific advantages of special value for projects • Critical project tasks typically constitute fewer than 10 percent of all the project tasks

  19. Summary • Although research indicates technological performance is not significantly affected by the use of PERT/CPM, there did seem to be a significantly lower probability of cost and schedule overruns • Network techniques can adopt either an activity-on-node or activity-on-arc framework without significantly altering the analysis

  20. Summary • Networks are usually constructed from left to right, indicating activity precedence and event times as the network is constructed • Gantt charts are closely related to network diagrams, but are more easily understood and provide a clearer picture of the current state of the project

  21. Scheduling Questions?

  22. Scheduling Picture Files

  23. Scheduling Figure 8-1

  24. Scheduling Figure 8-2

  25. Scheduling Figure 8-3

  26. Scheduling Figure 8-5

  27. Scheduling Figure 8-6

  28. Scheduling Figure 8-7

  29. Scheduling Figure 8-8

  30. Scheduling Figure 8-9

  31. Scheduling Figure 8-10

  32. Scheduling Figure 8-11

  33. Scheduling Figure 8-12

  34. Scheduling Figure 8-13

  35. Scheduling Figure 8-14

  36. Scheduling Figure 8-15

  37. Scheduling Figure 8-16

  38. Scheduling Figure 8-17

  39. Scheduling Figure 8-20

  40. Scheduling Figure 8-21

  41. Scheduling Figure 8-22

  42. Scheduling Figure 8-23

  43. Scheduling Figure 8-24

  44. Scheduling Figure 8-25

  45. Scheduling Figure 8-26

  46. Scheduling Figure 8-27

  47. Scheduling Figure 8-28

  48. Scheduling Figure 8-30

  49. Scheduling Table Files

  50. Scheduling