NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD

E.T.& L. CORP. NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD. NEXT BEAMS. E.T.& L. CORP. Quantity ~ 6 beams Length ~ 67 ‘ Width ~ 8’ Weight ~ 82,422 lb. NEXT BEAM BENEFITS. E.T.& L. CORP. Minimal deck formwork Ease of erection

arin
Télécharger la présentation

NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E.T.& L. CORP. NEXT BEAM INSTALLATION MASSDOT BRIDGE REPLACEMENT ROUTE 19 OVER MILL BROOK BRIMFIELD

  2. NEXT BEAMS E.T.& L. CORP. Quantity ~ 6 beams Length ~ 67 ‘ Width ~ 8’ Weight ~ 82,422 lb

  3. NEXT BEAM BENEFITS E.T.& L. CORP. • Minimal deck formwork • Ease of erection • Reduced construction time • Increased jobsite safety

  4. NEXT BEAM ISSUES E.T.& L. CORP. • Weight of Beams • Two Cranes • Unloading Area

  5. NEXT BEAM ISSUES E.T.& L. CORP. • Beam camber movement during concrete deck placement • Minimal adjustment for top of final deck elevation

  6. NEXT BEAM ISSUES E.T.& L. CORP. • Concrete clearance • 6” Stirrups • Overhang bracket clips • Bidwell Setup

  7. QUESTIONS / COMMENTS E.T.& L. CORP.