1 / 40

A Co. WILDCAT BATTALION TRAINING MEETING

28 SEP 04. A Co. WILDCAT BATTALION TRAINING MEETING. S-2 Brief Review 3-Month Calendar Review Last Weeks Training Wk IV: Training Focus and Guidance Wk III: Decision Brief Wk II: Information Brief Wk I: Pre-Execution Checks Wk 0: Pre-Execution Checks LDP Final Remarks. AGENDA.

arleen
Télécharger la présentation

A Co. WILDCAT BATTALION TRAINING MEETING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 28 SEP 04 A Co.WILDCAT BATTALIONTRAINING MEETING

  2. S-2 Brief Review 3-Month Calendar Review Last Weeks Training Wk IV: Training Focus and Guidance Wk III: Decision Brief Wk II: Information Brief Wk I: Pre-Execution Checks Wk 0: Pre-Execution Checks LDP Final Remarks AGENDA

  3. S-2 BRIEFING CDT/CPT Phillips

  4. News • - Insurgents attack Iraqi National Guardsmen in Mosul, and near Fallujah, and Baquba. • U.N. sends hundreds of peacekeepers to Haiti following Hurricane Jeanne which left at least 1,500 dead and 200,000 homeless.

  5. Weather 40 Percent chance of rain on Thursday

  6. Sports

  7. September 2004

  8. October 2004

  9. November 2004

  10. December 2004

  11. Land Navigation CDT/CPT Gardiner AAR

  12. SUSTAINS

  13. 1) Time 2) Know what points look like 3) Construction (site interference) IMPROVES

  14. M-16 Zero/Qualification CDT/CPT Fisher Wk IV: Training Focus & Guidance

  15. M16A2 Zero LLAB CDT/CPT Phillips Wk III: DecisionBriefing

  16. A CO Wildcat BN conducts M16A2 zero on 21OCT04 at 1300 HRS at Wasatch Shooter’s Association Range to train cadets on basic rifle marksmanship and prepare them for qualification. Mission

  17. Task: Conduct M16A2 zero LLAB Conditions: During daylight hours under range officer supervision Standards: Successfully zero one M16A2 Training Objectives

  18. All participants will meet at the east side of the Dee Events Center in the parking lot on 21OCT04 NLT 1250 HRS for the M16A2 zero LLAB. Concept of Operation

  19. Milestones

  20. Supply/S4:Water, M-16A1s, ammunition, ear plugs, zero targets Combat Lifesaver:CPT Faletto, MSG Whitmore Tasks to Subordinate Units

  21. Step 1: Identify Hazards: Dehydration, weapon malfunctions, unsafe weapon handling, civilians on a service road above the range Step 2: Assess Hazards: E H M L Step 3: Make Risk Assessment: Low Step 4: Implement Countermeasures: Water on site, SPORTS instruction, staying alert, range officers on site, combat lifesaver on site, contact with the local Sheriff Risk Management

  22. Uniform:BDUs, soft cap Equipment:LBE with gloves, two canteens, ruck with weather dependant gear, ballistic helmet Environmental Considerations: Possible cold or wet weather Coordinating Instructions

  23. Supply:water, M16A1s, ammunition, targets Transportation:POV, Bus Medical Evacuation:Davis Medical Center (801) 825-9561 Service and Support

  24. Identity/Planned Location of Lab OIC: CDT/CPT Phillips on site MSG Whitmore (628-5979) Identity/Planned Location of Senior Cadre member: LTC Sturgeon (589-1986), on site FM Radio Freq/Channel: 6/09 Command and Signal

  25. SITE SKETCH

  26. M-16 PMI CDT/LT Strader Wk II: InformationBrief

  27. Milestones 15 SEP 04 TRANS DEC MSG Whitmore GREEN 20 SEP 04 Equipment Supply SGT Moore AMBER 21 SEP 04 AI’s SS10 MS IV’s GREEN 22 SEP 04 Recon LLAB Site MSG W,Roberts GREEN

  28. Rappelling CDT/CSM Roberts Wk I: Pre-ExecutionChecks

  29. Milestones

  30. Transportation - HILL AFB Bus GREEN Equipment - LBE, Kevlar GREEN Area of Operation - Top of 9th Street GREEN Contingency Plan - In case of inclement GREEN weather, LLAB will be cancelled Wk I: Pre-ExecutionChecks

  31. SITE LAYOUT

  32. Drill and Ceremony CDT/LT Ashford Wk 0: Pre-Execution Checks

  33. Wk 0: Pre-Execution Checks Transportation – POV’s/ WSU Shuttle Equipment – LBE with two canteens of water, ruck sack with cold and wet weather gear Area of Operation –Dee Event Center NW Parking Lot Contingency Plan – Cadets will form in the Swenson Gym with Gym shoes available

  34. CDT/CPT Seegmiller LDP

  35. CURRENT EVALUATORS:20 SEP to 1 OCT 2004 PositionEvaluatorMSIII Cadet CO CDT Stevens CDT Barnes 1ST SGT CDT Valleta CDT Stuart PL CDT Roberts CDT Eldredge PSG CDT Tuttle CDT Davis 1 SL CDT Seegmiller CDT Alburo 2 SL CPT Faletto CDT Meservey 3 SL MSG Bryan CDT Teeples

  36. UPCOMING EVALUATORS:4 OCT to 15 OCT 2004 PositionEvaluatorMSIII Cadet CO CDT Fisher, M. CDT Redd 1ST SGT CDT Mair CDT Heber PL MSG Whitmore CDT Pugmire PSG LTC Stuart CDT Bensen 1 SL CDT Carver CDT Bolliger 2 SL LTC Sturgeon CDT Geib 3 SL CDT Carpenter CDT Scholte

  37. EVALUATION EVENTS: 29 SEP 2004 EventCOEvaluator1SGEvaluator BN OPORD CDT Redd CDT Fisher, M. CDT Heber CDT Mair

  38. Cards Due Wednesday6 OCT 2004 CDT Stevens CDT Valleta CDT Roberts CDT Tuttle CDT Seegmiller CPT Faletto MSG Bryan

  39. THE BLACK LIST

  40. Final Remarks

More Related