1 / 24

Deterministic Reserves Assessment Methods

Deterministic Reserves Assessment Methods. SPE/OERN Reserves ATW: Sharing the Vision John Lee Texas A&M University March 2011. Source of Presentation Materials. Draft version of new SPE/ AAPG/ WPC/ SPEE/ SEG (available free of charge on SPE Website) Guidelines for Application

arleen
Télécharger la présentation

Deterministic Reserves Assessment Methods

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Deterministic Reserves Assessment Methods SPE/OERN Reserves ATW: Sharing the Vision John Lee Texas A&M University March 2011

  2. Source of Presentation Materials • Draft version of new SPE/ AAPG/ WPC/ SPEE/ SEG (available free of charge on SPE Website) Guidelines for Application of the Petroleum Resources Management System Chapter 4

  3. Uncertainty and Assessment Methods: What, When, Range of Uncertainty

  4. Which Specific Method Is Most Appropriate? Depends on • Type, quantity, quality of geoscience, engineering, and economic data available and required for technical and commercial analyses • Geologic complexity, recovery mechanism, state of development, degree of depletion

  5. How Should the Deterministic Procedure Work? • Conduct ‘scenario analysis’ to bracket uncertainty and sensitivity to estimated values of parameters • Scenarios should represent low, best (most likely), high cases for original in-place and associated recoverable hydrocarbons • Depending on stage of maturity, scenarios represent PRMS categories of reserves (1P, 2P, 3P), contingent resources (1C, 2C, 3C), or prospective resources (low, best, high)

  6. Volumetric and Analogy Methods • Volumetric method uses static data to obtain estimates of petroleum initially in place • Analogy method used to estimate recovery efficiencies • Procedures useful during exploration, discovery, post-discovery, appraisal, and initial development stages of E&P life cycle for any petroleum recovery project

  7. Technical Principles • best determined from analog reservoir • In absence of rigorous analog, near-analog may be used • Numerical simulation (even lacking history match, if production data limited) also possibility • Analytical methods common in petroleum literature, but rapidly being replaced by simulation • Empirical correlations also available, but usually less satisfactory than simulation

  8. Example Illustrates Principles and Application • Example focuses on assessment of risk, uncertainty, classification, and categorization • Oil reservoir example: Various stages of maturity, over full life cycle

  9. Example: Resource Estimates in Exploration, Appraisal, Initial Development Stages • Example represents typical accumulation in mature petroleum basin with • Extremely large structures • Well-established regional reservoir continuity • Numerous adjacent analog development projects

  10. Pre-Discovery Structure, Net Pay Maps • Prospect developed with seismic, geological studies • 2D seismic defined structural spill point, provided no indication of fluid contact locations • Analog reservoir suggested 30-33o API crude oil

  11. Pre-Discovery Resource Estimates • High estimate: Based on regional analogs, assume structure full to spill point at 6,410 ft SS • Low estimate: Assume oil down to only 6,120 ft SS • Best estimate: Assume oil to intermediate depth of 6,265 ft SS • Uniform net-gross ratio of 0.7 assumed, and net-pay maps prepared

  12. Prospective Resource Estimates

  13. Post-Discovery-Well Analysis • Wildcat well encountered significant oil column sufficient to declare “discovery” • Geologic model updated (figure), net-gross pay ratio 0.75, net pay 89 ft • OWC not identified, so LKH in well penetration taken as OWC for low estimate (6,155 ft SS)

  14. Post-Discovery-Well Analysis • High estimate (3C): Assume structure full of oil to spill point • Alternative geological model indicates larger closure and higher recovery efficiency • Low estimate (1C): LKH defines 1C limit • Best estimate (2C): vertical limit set at 6,283 ft SS (intermediate depth) • Oil gravity found to be 32o API (PVT properties determined using this gravity)

  15. Post-Discovery-Well Reservoir Maps

  16. Post-Discovery-Well Volumetric Analysis

  17. Post-Discovery-Well Analysis • Economic analysis encouraging, but chance of commerciality still estimated to be only 60% • Reclassification as Contingent Resources appropriate • Chance of gas above HKH not ruled out, but ignored in this analysis, awaiting detailed PVT and pressure gradient data • Owners unwilling to commit funds to a development project without additional data • Appraisal program designed for further evaluation

  18. Appraisal/Delineation Stage • Appraisal program implemented • Two additional wells drilled, tested, samples taken for PVT analysis • 3D seismic data acquired • New wells established lower LKH depth to 6,240 ft SS • PVT analysis established that oil is undersaturated, eliminated potential for gas cap

  19. Appraisal/Delineation Stage • Logs, well tests, PVT analysis established • Initial pressure, reservoir temperature, average porosity, initial water saturation, reservoir permeability, oil gravity and viscosity, bubble-point pressure, Boi, Rsi • Stabilized rates averaging 3,500 STB/D • More definitive net/gross ratio distribution throughout reservoir

  20. Appraisal/Delineation-Stage Maps

  21. Appraisal-Stage Volumetric Analysis

  22. Recovery Project Implemented, Resources Classified as Reserves • Pressure maintained with peripheral water injection (well established in several analog reservoirs) • Project economics favorable • No market, legal or environmental contingencies identified • Management committed funds to project • Recoverable volume estimates refined, reclassified as reserves

  23. Process Continued Through Stages of Greater Reservoir Maturity, Additional Projects • Continue to conduct ‘scenario analysis’ to bracket uncertainty and sensitivity to estimated values of parameters • Scenarios continue to represent low, best (most likely), high cases for original in-place and associated recoverable hydrocarbons • Later scenarios focus on continued refinement of reserves categories (1P,2P,3P) • Applications Guidelines (Chapter 4) highly recommended for additional reading

  24. Deterministic Reserves Assessment Methods SPE/OERN Reserves ATW: Sharing the Vision John Lee Texas A&M University March 2011

More Related