1 / 12

Agenda

Agenda. School updates District wide updates Recycling report to county- Bruce Craig Energy star update- Wade Brosius Energy conservation project Overview- Mike Hanson, CM3 building solutions Project energy savings and environmental impact- Wade Energy education tools- Pat Dunn

armen
Télécharger la présentation

Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda • School updates • District wide updates • Recycling report to county- Bruce Craig • Energy star update- Wade Brosius • Energy conservation project • Overview- Mike Hanson, CM3 building solutions • Project energy savings and environmental impact- Wade • Energy education tools- Pat Dunn • Wrap up and next steps

  2. School Updates • Bethel • High School • Middle School • GVES • Concord

  3. County recycling Report • 32.23 tons of single stream recycling • Reduction of 1 trash and 1 recycling dumpster at Bethel Springs • GVES and Concord school  -  2 recycling dumpsters and 1 trash dumpster • GVHS and Concord  - looking into possibility of reducing the # of trash dumpster pulls and increasing # of recycling dumpster pulls • Garage products recycled • Antifreeze      720 pounds • Batteries      2,435 pounds • Radiators          40 pounds • Oil filters      1,200 pounds • Used oil        8,640 pounds

  4. Energy Star

  5. Energy Conservation Project • Project Goals • Reduced Energy Consumption • Reduced Operating Costs • State of the Art Equipment w/ Extended Warranties • Make All Buildings DDC Controlled • Standardized Equipment District Wide • Address Long Lingering Capital Needs

  6. Performance Contracts • Benefits of PC – streamlined process, more GVSD control • PCs streamline process for energy projects – reduces cost & time, allows for implementing more comprehensive project w/ immediate improvement in occupant conditions • Gives on site facilities staff more input to design and better control of final product • Project lowers operating costs by reducing energy use and replacing high maintenance cost equipment • Project fully completed in 2013 with minimal disruption

  7. Project Highlights • 12,344 fixtures impacted including 536 outdoor lights • Lighting based on occupancy thru sensors & energy education • New high-efficiency chillers at four schools • Digital control upgrades district wide • New high-efficiency water heaters

  8. Project Energy Savings • Approx. 3.5 million kWh • 2650 Metric Tons GHG http://www.epa.gov/cleanenergy/energy-resources/calculator.html

  9. Middle School Auditorium

  10. District Wide Energy Education • Partnership w/ Practical Energy Solutions • School specific faculty meetings • Help tying your existing curriculum to project goals • Monthly reporting of results to schools • “Nothing Saves More Than OFF”

  11. Next Steps • Goals for next meeting • Meeting date

More Related