Newtown Pike Extension Lexington, KY

Newtown Pike Extension Lexington, KY. FHWA 2006 Environmental Conference Arlington, VA, June 29 th , 2006 David Whitworth Transportation Planner/Environmental Engineer Kentucky Division. New Highway from West Main Street to South Broadway: comprised of 4 lanes w/median

arne
Télécharger la présentation

Newtown Pike Extension Lexington, KY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Newtown Pike Extension Lexington, KY FHWA 2006 Environmental Conference Arlington, VA, June 29th, 2006 David Whitworth Transportation Planner/Environmental Engineer Kentucky Division

  2. New Highway from West Main Street to South Broadway: comprised of 4 lanes w/median • Improve traffic flow of through traffic and draw unnecessary traffic out of downtown. • Improve access to UK central campus by efficient traffic routings. • Reduce vehicle congestion, improve safety, and improve bicycle and pedestrian environment. • Opportunity for improving downtown and increasing the quality of life in surrounding neighborhoods.

  3. Downtown Lexington Newtown Pike Extension will reduce traffic in Downtown Lexington 15% - 40% resulting in: • Improved traffic patterns, resulting in a revitalized west downtown area and better utilization of existing commercial and residential assets. • Flexibility to alter street system to encourage downtown development and activities, such two way streets, street closures, and reduced street widths. • Improved Pedestrian Environment

  4. Newtown Pike Extension History • 1930’s – proposed in City Master Plan • 1960’s – studied as an interstate type facility • Proposed in every LFUCG long-range transportation plan since 1971 • 1971 & 1981 studies contained recommendations for resolving zoning, housing, and community issues for Davistown and Irishtown • 1975 draft EIS; never signed because of high number of residential and commercial relocations • 1997-2000 – Study to consider Limestone and Euclid Corridors • 2001 – Design, Environmental, and Corridor Plan Implemented Main Street - @ 1915

  5. Why Now? • Large growth in Lexington in 1980s and 1990s • Deteriorating conditions in area due to landlord neglect and overshadow of project. • Abandonment of a railroad line near the neighborhood. • Political willingness to act. • 1995, two-day workshop of representatives from state, city, UK, and transportation consultants to study feasibility of NPE project. • 1998, FTA permitted the project to bypass MIS and proceed directly to environmental studies. Also, a stakeholders committee met and determined purpose and need.

  6. Existing Southend Park

  7. Existing Southend Park

  8. Existing Davistown

  9. Why Environmental Justice? • Impacts from the adjacent roadway project would cause disproportionate impacts (including indirect/secondary/cumulative) to the lower Davistown neighborhood (also known as Southend Park) BECAUSE • Data indicated (and verified) that over 43% of residents were minorities and over 74% were low income. It is the “Most economically disadvantaged neighborhood in Lexington.”

  10. Project team says, “this project is not like the others!”

  11. How Can We Mitigate ? • Community Disruptions • Relocations of the Neighborhood • Elimination of Low-Income Housing • Impacts to Southend Park (4f property)

  12. Mitigation Measures • Purchase entire 25 acre tract of community • Rebuild Infrastructure • Construct in stages (goal of only moving residents ONCE). • Temporary Housing (if necessary) • Rebuild sustainable, affordable housing • Implement community services • Organize community (CLT)

  13. SouthendPark Neighborhood Redevelopment Goals • Provide a level of affordable, safe and decent housing for existing residents at or near the same rent or house payment • Maintain Community Cohesion and Minimize Community Disruption • Provide Support Services and Counseling • Plan and design a neighborhood that is livable, affordable, and sustainable

  14. Why relocate back to the area?! • 95% residents wanted to stay in the area (10 owners and 25+ renters included) • Access to social services (Nathanial Mission) • Relatives and former residents wanted to move back to area. • Average resident has been there 31 years. • Need for affordable housing (median rent = $288 and don’t qualify for public housing). • Zoning changes planned.

  15. Proposed Southend Park • 100+ Affordable Single Family and Townhouse Residential Units (32 existing) • Mixed Use Development providing neighborhood commercial, office, and residential opportunities • Non Profit Development providing social support services • Enhanced Southend Park (Baseball field/recreation area) • Improved Infrastructure – Roads, Drainage, Utilities, Noise Wall

  16. Community Land Trust • Protect Housing Affordability Long Term • Involve Community Members in Land Ownership and Land Use Planning • Holds and Can Transfer Ownership of Property • Protects Neighborhood Integrity • Can involve non-profits in Housing Development • Can Provide Rental Units • Is Self Sustaining

  17. Community Land Trust… • Removes land cost from price of a home, making it more affordable. • Allows the neighborhood to own commercial property and its use. • Allows trust to provide support services to its homeowners. • Places restrictions on absentee ownership. • Allows board of directors made up of community representatives to govern the trust. • Provides families opportunity to own homes. • Provides way for homes to stay affordable via pre-set resale formulas. • Prevents land from being sold to developers. • Preserves character of the neighborhood.

  18. How to accomplish?! • Staged construction for project • Establish manufactured homes in park area. • Use of manufactured homes by displaced residents during staged construction. • Keep community together for those who wish to remain. • Minimal disruption to lives.

  19. Newtown Pike Extension Cost Total Highway = 36,400,000 Neighborhood Red. = 37,900,000 Total Project Cost = 74,300,000 Anticipated Funding Sources: FHWA, HUD, KYTC, LFUCG, and others

  20. RELOCATION PAYMENTS IN A CLT

  21. Newtown Pike Extension Anticipated Schedule * SCHEDULE DEPENDENT ON AVAILABILTY OF FUNDING • Design/Environmental Assessment/Planning: • 2001 – 2006 • Right of Way Acquisition/Utility Relocations: • Late 2006 – 2009 • Southend Park Implementation: • 2006 – 2012 • Roadway Construction • 2008 – 2012

  22. Existing Southend Park

  23. Proposed Southend Park

  24. Proposed Southend Park

  25. Proposed Southend Park Mixed Use Development providing neighborhood commercial, office, and residential opportunities

  26. Community Involvement • Public Meetings • Surveys (Neighborhood and Individual) • Neighborhood Liason • Focus Groups • Newsletters • Web Site (www.newtownextension.com) • Neighborhood Association

  27. QUESTIONS?

More Related