1 / 9

Sustainable Pavement Management Plan

AustStab Awards of Excellence 2014. Sustainable Pavement Management Plan. City of Gold Coast Category 3: Innovation or Excellence in Sustainability in pavement stabilisation. Sponsored by. Sustainable Pavement Management Plan. Create and Implement a Sustainable Pavement Management Plan

asabi
Télécharger la présentation

Sustainable Pavement Management Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AustStab Awards of Excellence 2014 Sustainable Pavement Management Plan City of Gold Coast Category 3: Innovation or Excellence in Sustainability in pavement stabilisation Sponsored by

  2. Sustainable Pavement Management Plan • Create and Implement a Sustainable Pavement Management Plan • Vision: to implement a fit-for-purpose sustainable pavement management plan balancing City of Gold Coast economical, social and environmental needs. • The Sustainable Pavement Management Plan is about applying cost effective surfacing treatments to structurally sound pavements at the right time to restore an existing road almost to original condition with the potential to achieve a life of 80 years.

  3. Sustainable Pavement Management Plan Sets out the current Pavement Rehabilitation Treatment Selection Process • Determine purpose and scope • Evaluate existing pavement and subgrade • Develop alternative strategies • Design treatments • Select option(s) and make recommendations

  4. Sustainable Pavement Management Plan Pavement Rehabilitation Options • Cracksealing • Surface rejuvenation • Thin asphalt overlay • Full depth asphalt • Foam bitumen stabilisation • Cement stabilisation

  5. Sustainable Pavement Management Plan Sustainability in Asphalt Recycling, The Hot Insitu Pavement Asphalt Recycling (HIPAR) process could achieve cost savings up to 35 percent (environmental & economical sustainability) Example of HIPAR Process . The CoGC has been adopting the HIPAR technology for more than 10 years.

  6. AustStab Awards of Excellence 2014 Pavement Recycle2 Uplands Drive Insitu Pavement Recycling Twice City of Gold Coast Category 4: Innovation or Excellence in Recycling in Stabilised Pavements in Local Government Sponsored by

  7. Pavement Reycle2 – Uplands Drive • Previously cement stabilised pavement failures

  8. Pavement Reycle2 – Uplands Drive • During construction, second time In-Situ Cement Stabilisation 2012

  9. Pavement Reycle2 – Uplands Drive • 2014,Uplands Drive final pavement after Recycling. Two years after construction with no evidence of reflective cracking

More Related