An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Soudan Installation: Fermilab • Constructing • RF Clean Room • HVAC & Radon Filtering • Detector Preparation Room • Electronics Hut • Equipment Room CDMS II Overview - Gaitskell - CfPA EAB Review

  2. Soudan Mine • First Iron Mine in Minnesota • In production until 1962 => State Park & Site for Experimental Physics • Existing Cavern • 73x14x14 m3 • Depth 713 m (2000 mwe) CDMS II Overview - Gaitskell - CfPA EAB Review

  3. Soudan Cavern New MINOS Cavern (not constructed yet) CDMS Huts, Fridge & Clean Rooms (Foundations going in) Existing Soudan I Experiment CDMS II Overview - Gaitskell - CfPA EAB Review

  4. Soudan Gamma Background 104 2.8 MeV Gammas/m2/s 1 • Gamma Background • ~half that at SUF • 20 cm Pb will achieve 0.03/keV/kg/day @10keV • Rock Composition • Ely greenstone • 50% SiO2 • 15% Al2O3 • ~20% CaO,FeO,MgO • 5” Shotcrete on walls has ~2x activity CDMS II Overview - Gaitskell - CfPA EAB Review

  5. Soudan Neutron Background /1 • Low Energy (20 keV-5 MeV) • Natural Radioactivity Dominant Source • (a,n) a from U,Th on light nuclei =>2x10-8 n/g/s • Fision => 2.7x10-9 n/g/s CDMS II Overview - Gaitskell - CfPA EAB Review

  6. Soudan Neutron Background /2 • High Energy (50 MeV-2 GeV) • Muons • In spite of low fluxes, “punch” through shield • Significant in range 150 MeV->650 MeV Relative contribution of neutrons to detector hits MC of Neutron Spectrum from 5 m shell of rock due to hard muon spectrum CDMS II Overview - Gaitskell - CfPA EAB Review

  7. Soudan Neutron Background /3 Simple Shield 22 cm Pb inside 50 cm poly • Shield Design • Neutron Management 10 poly; 8 Pb; 10 poly; 15 Pb; 30 poly (cm) CDMSII Target DM 0.0003 events/keV/kg/day CDMSII Target DM 0.0003 events/keV/kg/day Composite Shield Illustrated CDMS II Overview - Gaitskell - CfPA EAB Review

  8. Shield & Active Veto • Cylindrical Geometry • Plastic Scintillator Veto >99.8% Efficiency • 12t Pb will generate neutrons which interact at 0.05 /keV/kg/day @ 10 keV Active Veto Poly & Pb ICEBOX FRIDGE CDMS II Overview - Gaitskell - CfPA EAB Review

  9. Cryogenic Systems: Fermilab • Purchased Dilution Refrigerator • Fabricate CDMS II Icebox • Design & Purchase Control Systems for Cryogenics • Learning lessons from SUF operations CDMS II Overview - Gaitskell - CfPA EAB Review