An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HRMT01 – TISD Tests at HiRadMat of advanced SiC and Al2O3 as model targets for radioisotope beam production HiRadMat Technical & Safety Review Collaboration: Michal Czapski*, Thierry Stora*, Stefano Sgobba*, Raul Luis***, Stefano Marzari*, Serena Cimino*, DanielUrffer**, CarolineTardivat*** *CERN: EN-STI-RBS & EN-MME-MM **Saint Gobain CREE (advanced ceramics R&D) ***ITN Lisbon

  2. Goal of the proposal : Comparison ageing studies of influence of pulsed beams of 1.4 GeV (ISOLDE) and 450 GeV (HiRadMat) on new advanced model targets of tailored-made microstructure (synthesized at SG CREE – world leader in ice-templatingmethod) to understand how beam energy impacts ageing (causing decrease of good release efficiencies of ISOLDE targets). The study is a part of an upgrade of a ISOLDE facility i.e HIE-ISOLDE project

  3. The experiment General Plan: Preparation, assembly (in the nearby lab) and installation in the irradiation area (1 day) Beam time (4days – 1000 high intensity pulses) De-installation – cooling down time (expected 1 year) Removal from the area (1 day) Move in a lab at CERN (building 599) for analysis and tests

  4. Setup No Vacuum No additonal cooling

  5. preparation & installation PHASE • Sample material will be put into the aluminum container and screwed with two caps to isolate the irradiated material from external environment. • The stand supports and the container should be installed on the motorized table in one phase. SiC Graphite Alumina Not activated Not toxic Solid

  6. Operation phases Irradiation w44 (29/10-02/11) • 4.9×1013ppp • 1000 pulses • sigma=2.0 • Operated remotely from HRMT CR • Cool-down Storage and Maintenance • After the irradiation the table with the setup should be moved to the HiRatMat cool-down area for a period of one year • No post-exposure observations are planned before transport to the cool down area • No special precautions must be taken during the storage procedure

  7. RISK ANALYSISRadiological assessment RÈGLES GÉNÉRALES D'EXPLOITATION - CONSIGNES GÉNÉRALES DE RADIOPROTECTIONINSTRUCTION GÉNÉRALE DE SÉCURITÉ - Critères et exigences ALARA pour les interventions EDMS Id: 810176 v.2

  8. Radiological assessment

  9. SiC Alumina Al container

  10. RISK ANALYSISMechanical analysis 50W  lightbulb

  11. RISK ANALYSISMechanical integrity assessment • Assumption: • the highest energy deposition • No cooling through the container • No beam losses The worst case scenario

  12. Post-irradiation phase and disposal • 1 year of cool down • Dismantling (pliers, with RP officer) • Putting into lead-shielded container provided by HRMT • Transportation to b. 179 (RP officer, RP vehicle) • Pellets exctraction under the fume hood, disposal of the container • Putting samples into plastic bags, transportation in a lead-shielded container to b. 599 (EN/EMM-MM group) (RP officer, RP vehicle) • the SEM, XRD analysis (with RP officer) (following the steps of ISOLDE target #453) • Nessecary precautions (aerosol monitors) • Insertion/exctraction time < 1min • Sample holder • Mechanical separation (SEM casing, XRD window > 0,5 m)

  13. Measures • Technical measures • Single containment. The pellets will be put inside asealedaluminium container in order to avoid any radiological contamination • Additional shelter and/or cooling fins can be proposed to increase level of safety and mechanical stability • Two supports, which will confine a sample container in order to avoid any possible displacement of the container under irradiation. • Organizational measures • Access procedures according to EDMS 1155061 • Radiation cool-down period. The equipment should be stored for a period of one 1 year • Personal measures • All personnel involvedin setting up the experiment will complete the required CERN safety courses according to EDMS11549448

  14. Conclusions • Setup design ready for machining • 1 year cool-down should significantly and sufficiently increases the risk of radiological hazard (below C class) • Mechanical integrity should be preserved nevertheless additional precautions can be taken • Post-irradiation analysis should not be a cause of a radiological hazard nevertheless extra safety steps will be taken

  15. THANK YOU