1 / 11

New Muon Lab SCRF Test Facility Sergei Nagaitsev Oct 15, 2007

New Muon Lab SCRF Test Facility Sergei Nagaitsev Oct 15, 2007. ILC S2 recommendation. ILC S2 task force (string test definition) recommends: the minimum size system test needed to confirm the performance of a new design is a single RF unit with ILC like beam.

Télécharger la présentation

New Muon Lab SCRF Test Facility Sergei Nagaitsev Oct 15, 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New Muon Lab SCRF Test Facility Sergei Nagaitsev Oct 15, 2007

  2. ILC S2 recommendation • ILC S2 task force (string test definition) recommends: the minimum size system test needed to confirm the performance of a new design is a single RF unit with ILC like beam. • ILC RF unit is 3 CMs powered by a 10 MW MBK • Many tests are statistical in nature, a longer string test with several RF units would be better. Nagaitsev

  3. Rough S2 Schedule Nagaitsev

  4. Fermilab cryomodule plan • 1st Cryomodule (2007) • Assemble a TESLA TTF type III CM from DESY “kit” • Cavities built and fully tested by DESY • 2nd Cryomodule (2008) • Also TTF type III cryomodule • Cavities are processed and tested in the US • Electropolished and tested at JLAB, Cornell, and ANL/FNAL • Cryostat and cold mass from Zanon in Europe • 3rd Cryomodule (2009) • 1st type IV ILC cryomodule built anywhere • Parts built in U.S. industry • 4th-6th Cryomodules (2010-11) • Build ILC RF unit in U.S. • Transfer knowledge gained to Industry Nagaitsev

  5. NML • NML is a facility to be located in the existing building at Fermilab (New Muon Lab) • New Muon Lab building is part of Fermilab’s ILC Test Areas (ILCTA_NM) • Other areas are: MDB (horizontal SCRF cavity test stand), IB1 (vertical test stand) etc. • The first NML user will be the ILC program. • The cryomodule tests are also essential to Project X (β=1) • The Accelerator R&D (AARD) portion will first piggy-back on these programs; its share will increase with time Nagaitsev

  6. Fermilab NML plans • Phase-1 (FY07 - FY08) • Prepare Facility for Testing of First Cryomodule (CM1) without Beam • Infrastructure, RF Power, controls • Cryogenics (Refrigerator #1) => reuse of existing TeV refrigerator • Phase-2 & 3 (FY08 - FY10) • Install Gun, Injector, CM2 and CM3, Test with Beam • New RF Gun • Move A0 Photo-Injector to NML and Install Test Beamlines • Extend Building to fit Third Cryomodule • Cryogenics (Refrigerator #2 ) • Upgrade RF System to 10 MW • FY11 and beyond run ILC RF unit with full ILC parameters • Concern: to run at 5 Hz need a new cryoplant (300 W at 2K). Money for it is not in FY08 or in FY09??. Two year lead time. Nagaitsev

  7. Phase-1 Layout of NML Capture Cavity 2 (CC2) Cryomodule-1 (CM1) (Type III+) CC2 RF System 5 MW RF System for CM1 Nagaitsev

  8. Overall layout of New Muon Lab Capture Cavity 1 (CC1) Cryomodules RF Gun CC2 Gun RF System CC1 & CC2 RF 5MW RF System for Cryomodules Space for 10 MW RF System Nagaitsev

  9. NML building extension • Began Design of NML Extension with CF&S Group (FESS) • Room for 6 Cryomodules (2 RF Units) • Expanded Diagnostic and AARD Test Area • Cryoplant (300W) • Possible 2-Tunnel Design to Mock-up ILC Design Nagaitsev

  10. Current photo of NML Nagaitsev

  11. NML summary • NML is being constructed to address the ILC S2 R&D list, to test ILC baseline and alternative components, and to conduct AARD. • The A0 photoinjector will be part of the NML facility • Progress is resource limited • FY07: 4.9M$ (M&S direct), 40 FTE’s • FY08: anticipate similar resources • Collaborations: • SLAC will supply RF distribution system. May be a model for Project X. • ANL, DESY, KEK, INFN • Already have 2 graduate students in accelerator physics working on NML design. • AARD program is still developing • Had a workshop in Nov 2006 to “gauge” outside interest Nagaitsev

More Related