An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Real time data in Statoil

  2. Integrated Operations in Statoil Vision Automated and remotely operated fields Definition An instrumented and automatedfield that utilizes People and Technology to remotelymonitor, model and control processes in a collaborative, safe and environmentally friendly way in order to maximize field life value.

  3. How do we address ’Integrated Operations’ in Statoil?

  4. Statoils Onshore Support Centre, Stjørdal • Onshore Operation Center (OOC)– • 24/7 under operation • Operator and service companies • Faster learning curve of team due to increased exposure • Trained staff in uncertainty and risk mgt. • Remote control of geo-steering • Expertise is not confined to one asset • Ability to link resources between other geographic operation centers e.g. Bergen, Stavanger & Stjørdal • Video conferencing capability

  5. Tampen Integrated OperationsWay forward • Step 1 “ Incremental step” Implement Local e-drilling and “e-production management in all Tampen assets. • Step 2 “ Step Change” Establish a 24/7 Onshore Operational Centers (OOC) in Bergen and Stavanger to cover all RESU operational activities in the Tampen area • Step 3 Automated real-time monitoring, control and optimizations of all operations for fields in the Tampen Area from the Onshore Operational Centers Expand OOC to cover other Statoil assets as; INT & UPN Tampen Area

  6. Real-time data development

  7. Real time related development • DART R&D project (started in 1997) • Developed DART Loader, a tool for transfering drilling data onshore • Used DART Loader knowledge in Statoil’s WITSML participation • Worked together with Landmark in their OpenWire development (input&testing) • Developed Survey QA/QC in 2002/2003 • Application for automated real time data management and independent quality control service for directional survey data

  8. Real time related imeplementation • OpenWire implemented in Statoil 2003/2004 (Real Time Service – RTS) • Real time centre with OpenWire, supporting all licenses/operation rooms • 24/7 support in the near future • Vast majority of 2003 ”WITSML wells” in the world drilled by Statoil on the Norwegian continental shelf. • Time based drilling data • Currently Statoil does not have a solution for viewing/accessing time based drilling data • We are are in the process of acquiring a system • There is no off-the-shelf product/solution available • We have tenders from 7 potential vendors – that shows great interest • Evaluation in process • Contract to be awarded Q2 2004

  9. Current RTS setup Office Anywhere Depth based project data db RTS service Open Wire Timebased drilling data db (Coming soon) Onshore Operational Centre Home

  10. Onshore Support Center OpenWorks Applications DecisionSpace Current Survey QA/QC setup Schlumberger Baker Hughes Halliburton WITSML Survey QA/QC OpenWorks Database Directional Database Compass

  11. Future development • WITSML for time-based right-time data (drilling, production and facilities) • Formats • Procedures • Tools / models • Consolidate the current developed WITSML standard for depth based data and increase the use of the full potential in the defined standard • WITSML formats for seismic data?

  12. IMPORTANT FOR SECURING PAYBACK FROM ’INTEGRATED OPERATION’ SOLUTIONS!!! FOCUS ON CHANGES IN THE WORKFLOWS, BUILDING FACILITIES IS NOT THE PROBLEM