1 / 14

Microalgae to Biodiesel Week 9

Microalgae to Biodiesel Week 9. Group Delta Valerie Delligatti Dan Detro Kevin Jackson Joshua Jones Xin Qin. Raceway Pond/PBR. To extraction Unit. Photobioreactor/Raceway Ponds. Approximate Area of PBR/Raceways. x 8. x 8. Material Balances. Extraction Data. Hexane Usage:

aviv
Télécharger la présentation

Microalgae to Biodiesel Week 9

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Microalgae to Biodiesel Week 9 Group Delta Valerie Delligatti Dan Detro Kevin Jackson Joshua Jones Xin Qin

  2. Raceway Pond/PBR

  3. To extraction Unit Photobioreactor/Raceway Ponds

  4. Approximate Area of PBR/Raceways

  5. x 8 x 8

  6. Material Balances

  7. Extraction Data • Hexane Usage: • Extractor: 73,566 Gallons • Work Tank: 16,050 Gallons • DT: 13,376 Gallons • Dist. : 6,688 Gallons • Total: 109,679 Gallons • Hexane cost • $134.72 per Gallon • Cost: $14,776,284

  8. Extraction Data • Mineral Oil Usage • 10,000 Gallons • $19.51 per Gallon • Cost: $195,100 • Cooling Water Usage • 14,713 GPM • 10 degree max temp. rise • Steam Usage • DT: 53,503 lb/hr • Total: 108,342 lb/hr

  9. Comparison of Microalgal Oil and Diesel

  10. Rough Excavation Cost • Need approx 25,000 of 980.0 square meters of 0.30 meter deep trenches for raceway ponds. Is approx 10,337 cf of “dirt” removed for each pond. • Excavation includes machine excavation with front end loader or backhoe, two trucks with 30 minute trips per load. Dumping fee not included. • Have not taken into account any tree or rubble removal from site or any concrete laying etc. Only dirt dig and removal.

  11. Rough Excavation Cost • May be able to sell dirt from dig. • Labor cost is $1,156 • Cost of removal of cf of “dirt” is $7,649 • Total is $8,805 (per pond) X 25,000 ponds = $220,125,000 • Estimated from online calculator “HomeTech Cost Estimator”

  12. Plant Cost • Algae Production • $220,000,000 • Does not include cost of PBR tanks and FDSF • Extraction • $24,000,000 • Scaled from soy crush plant estimates • Biodiesel Production • $183,564,777 • Scaled from DOE data

  13. Plant Cost • Total Estimate • $427,564,777

  14. Our Wiki groupdelta.wikispaces.com

More Related