1 / 16

RF Conditioning of TTF3 Input Power Couplers & Acceptance Criteria for XFEL

3 rd SPL Collaboration Meeting (CERN, 12 November 2009). IN2P3 Les deux infinis. RF Conditioning of TTF3 Input Power Couplers & Acceptance Criteria for XFEL. Lucija Lukovac (LAL). Overview. RF conditioning of TTF3 power couplers Power coupler specifications

axel
Télécharger la présentation

RF Conditioning of TTF3 Input Power Couplers & Acceptance Criteria for XFEL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3rd SPL Collaboration Meeting (CERN, 12 November 2009) IN2P3 Les deux infinis RF Conditioning of TTF3 Input Power Couplers & Acceptance Criteria for XFEL Lucija Lukovac (LAL)

  2. Overview • RF conditioning of TTF3 power couplers • Power coupler specifications • RF conditioning procedure • Results • Acceptance criteria for XFEL power couplers • Power coupler specifications • Conditioning • Accepting a coupler : good or excellent?

  3. RF conditioning of TTF3 power couplers TTF3 input power coupler specifications

  4. RF conditioning of TTF3 power couplers RF conditioning procedure Warm test stand : travelling wave mode @ LAL Procedure Test stand Control parameters Cryomodule - reconditioning : standing wave mode @ DESY Off resonance = Warm test stand On resonance 20 μs -> 200 μs Pmax = 1 MW 400 μs Pmax = 330 kW 500 μsflat top + flat top 100 μs, 200 μs, 400 μs, 800 μs Pmax = 250 kW sweeps 500 μs + flat top 800 μs

  5. RF conditioning of TTF3 power couplers Results from the Warm Test Stand H. Jenhani et al., NIM A 595 (2008)

  6. Acceptance criteria for XFEL power couplers XFEL input power coupler specifications 800 couplers to be delivered over 2 years • 8 couplers per week  Constrains on TOTAL CONDITIONING TIME

  7. Acceptance criteria for XFEL power couplers Conditioning : Infrastructure clean room (cl. 10 000 / iso 7) mobile clean room (cl. 100 / iso 5) stock RF station Managed by E. Genesseau (LAL)

  8. Acceptance criteria for XFEL power couplers Conditioning : Infrastructure klystron couplers conditioning bench circulator transfo Managed by E. Genesseau (LAL)

  9. Acceptance criteria for XFEL power couplers Conditioning : Infrastructure load (2 MW) arc detector load (5 MW) pressure interlock pressure window pressurized wave guide WR650 wave guide WR650 hybrid coupler (3dB) bellow load (2 MW) circulator load (1 MW) Managed by E. Genesseau (LAL)

  10. Acceptance criteria for XFEL power couplers Conditioning : lessons learned from TTF3 couplers Cleaning & Assembly • Class 10 clean room • US bath cleaning with detergent + high temperature • Drying with filtered N2 and under laminar flux • Particle count • Leak test Cleaning & assembly procedure @LAL To be performed by the manufacturer ! Follow the procedure M. Lacroix et al., LAL internal report

  11. Acceptance criteria for XFEL power couplers Conditioning : lessons learned from TTF3 couplers Cleaning & Assembly Conditioning of the Toshiba XFEL prototype pair @LAL Conditioning times @DESY on the warm test stand Time needed to achieve given power level

  12. Acceptance criteria for XFEL power couplers Conditioning : lessons learned from TTF3 couplers In situ baking Gas analysis H. Jenhani et al., NIM A 595 (2008)

  13. Acceptance criteria for XFEL power couplers Conditioning : lessons learned from TTF3 couplers Conditioning procedure H. Jenhani et al., NIM A 595 (2008)

  14. Acceptance criteria for XFEL power couplers Accepting a coupler : good or excellent? Example of refused coupler • Mechanical : dimensions, visual inspection • Material tests (TiN & Cu coatings) • Following the cleaning and assembly procedure • Particle count • Leak tests • In situ baking gas analysis • Time needed to achieve given power level • Total conditioning time => excellence • Number of interlocks => refusal

  15. Acceptance criteria for XFEL power couplers Accepting a coupler : XFEL prototypes ACCEL – RI TOSHIBA Arcing in WG transition

  16. Acceptance criteria for XFEL power couplers Acknowledgements LAL-Orsay J.Bastide, T.Chabaud, A. Falou, T. Garvey, E.Genesseau, A.Gonnin, L.Grandsire, E.Herry, H.Jenhani, M.Lacroix, L.Leloup, P.Lepercq, B.Mercier, E. Mistrera, F. Letelier, M. Omeich, S. Prat, C.Prévost, Y.Peinaud, A.Thiebault & A. Variola DESY-Hamburg S. Choroba, A. Gossel, O. Hensler, F.Hoffmann, V. Katalev, D. Kostin, A.Matheisen, W-D. Möller & C. Mueller

More Related