An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work Package 2 Current status and schedule Giacomo Grasso ENEA UTFISSM-PRONOC LEADER PCC meeting Karlsruhe, November 23, 2012

  2. ELFR domain • Core design performed • Complete core characterization completed • Core data provided to WP5 (“LFR database for safety analyses”) • Complete Thermal/Hydraulic analysis going to start • Mechanical design performed • Radiation damage analysis not yet performed • Transition from start-up to equilibrium core underway Task 2.1 Task 2.1 Task 2.1 Task 2.3 Task 2.4 Task 2.5 Task 2.1

  3. ALFRED domain • Core design performed • Complete core characterization completed • Core data provided to WP5 (“ALFRED database for safety analyses”) • Complete Thermal/Hydraulic analysis almost done, report in progress • Mechanical design performed • Radiation damage analysis performed, finalizing the report Task 2.2 Task 2.2 Task 2.2 Task 2.3 Task 2.4 Task 2.5

  4. Docs organization

  5. WP2 timing Mil 03 Mil 09 Mil 02