1 / 1

Gas field development involves the optimal selection of well number , well placement , well tubing size , and pipeline characteristics to deliver a specified contract rate (DCQ - daily contract quota) and specified contractual (plateau) period.

baby
Télécharger la présentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gas field development involves the optimal selection of well number, well placement, well tubing size, and pipeline characteristics to deliver a specified contract rate (DCQ - daily contract quota) and specified contractual (plateau) period. • The engineering tools required are (a) reservoir material balance(s); (b) well rate equations for reservoir and tubing; and (c) pipeline rate equations. Reservoir simulation is often not necessary, but may be convenient. • Data acquisition is needed early to estimate key parameters in the calculations mentioned in (2). These include core data, log interpretation, geologic mapping, and well testing. • Field gas rate ‘swing’ considerations may be important, accounting for a seasonal variation in production rate demand (maximum in winter). • Compression design may be important during the contractual period, but almost certainly during the decline period of production. • Uncertainty analysis should focus on the parameters which are known to be important and known to be uncertain (IGIP, kh, skin, aquifer strength).

More Related