1 / 1

JCIDS and Acquisition (Interim DoDI 5000.02, Nov 2013)

JCIDS and Acquisition (Interim DoDI 5000.02, Nov 2013). Analysis of Alternatives (AoA) Acquisition Strategy Test & Evaluation (T&E) Master Plan (TEMP) System Engineering Plan (SEP ) Life Cycle Sustainment Plan (LCSP) Operational Mode Summary/Mission Profile (OMS/MP).

baby
Télécharger la présentation

JCIDS and Acquisition (Interim DoDI 5000.02, Nov 2013)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JCIDS and Acquisition(Interim DoDI 5000.02, Nov 2013) • Analysis of Alternatives (AoA) • Acquisition Strategy • Test & Evaluation (T&E) Master Plan (TEMP) • System Engineering Plan (SEP) • Life Cycle Sustainment Plan (LCSP) • Operational Mode Summary/Mission Profile (OMS/MP) • Technology Demonstrated • Initial Key Performance Parameters/ Key System Attributes (KPPs/KSAs) • Acquisition Strategy (AS) • TEMP • SEP • LCSP • OMS/MP • Final Design • Developmental T&E (DT&E) • Operational Assessments (OA) • Revise KPPs/ KSAs • AS • Acquisition Pgm Baseline (APB) • TEMP • SEP • LCSP • OMS/MP • Low Rate Initial Production (LRIP) • Initial Operational T&E (IOT&E) • Full-Rate Prod (FRP) • AS • APB • TEMP • SEP • LCSP • OMS/MP Identification of Capability Requirements President, SECDEF & Chairman: • Operational Planning • CBAs & Other Studies • Exercises/Lessons Learned • JCTDs/JUON/JEON/ Experiments • JIEDDO Initiatives • Defense Business Sys • Strategic Guidance OSD/Joint Staff Outputs • Integrated Security Constructs • Joint Concepts • LRIP • FOT&E • Mission & Problem • Capability Gaps • Tasks • Performance • Conditions • Operational Risk • Non-Materiel Approaches • Materiel Approaches • Recommendations CDD Val RFP Rel Materiel Development Decision MS A MS B MS C FRP Activity Engineering & Manufacturing Development Technology Maturation & Risk Reduction Draft CDD Capabilities-Based Assessment / Other Select Joint Concept Develop CONOPS Materiel Solution Analysis Production & Deployment CPD ICD CDD Analysis of Alternatives (AoA) Competitive Prototyping Develop, test, LRIP & Full Rate Production, deploy to warfighter, IOC Military Services CCMD JROC action for JROC Interest programs (ACAT I & IA) OSD (AT&L, CAPE), Services and OSD (DOT&E) -- Joint Staff (JROC) Joint Staff / Joint Requirements Oversight Council / OSD SECDEF Validates ICD Reviews AoA Results Validates CDD Validates CPD Develop, Test, Produce & Field Select Materiel Solution Policy Identify Capability Requirements Getting The Front End Right is Key

More Related