1 / 11

SLS-C&S WG

SLS-C&S WG. Spring 2004 Meeting Summary to SLS Area Director. SLS-C&S WG summary. Problems report: Missing consensus. Future work/charter: Future work will continue as BOF. Charter to be produced. See further for details. Discussed Topics (1/3).

baker-orr
Télécharger la présentation

SLS-C&S WG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SLS-C&S WG Spring 2004 Meeting Summary to SLS Area Director

  2. SLS-C&S WG summary • Problems report: • Missing consensus. • Future work/charter: • Future work will continue as BOF. Charter to be produced. • See further for details.

  3. Discussed Topics (1/3) • Serial Concatenated Convolutional Codes for 8PSK (ESA/ESTEC/Polito) • Proposal currently ongoing in RFM; informative for C&S. Possible future options together with new modulation schemes. • Complexity Comparison of Coding Schemes (ESA/ESTEC/Polito)

  4. Discussed Topics (2/3) • Requirements, Benchmarking & Overview of Proposed LDPCC (ESA/ESOC/UniBO) • Initial proposal to be discussed and refined with WG Members. • Generalized IRA LDPCC (ESA/ESOC/UniBO) • Further possibility for refining LDPCC selection.

  5. Discussed Topics (3/3) • Orange Book Progress & Considerations on Requirements (NASA/GSFC) • JPL Proposal for LDPCC (NASA/JPL) • CNES proposal supporting DVB-S2 adoption (CNES)

  6. Problem & Way Out (Hopefully) • Three Different proposals tabled • NASA/GSFC Quasi-Cyclic LDPCC • NASA/JPL Protograph LDPCC • CNES support to DVB-S2 •  NO CONSENSUS • WG not justified any more • Migration to BOF or complete stop?

  7. Migration to BOF or complete stop? • Member Agencies recognize the difficult status without consensus and take proactive approach. • Principle agreement for a set of “agreeable” codes reached. • Codes shall be evaluated by BOF work and eventually generate consensus proposal for WG. • Resolution: Convert WG to BOF.

  8. Agreed Set • Rate ½ Code to be derived by JPL proposal • Rate 7/8 Code to be derived by GSFC proposal C2 • Rates 2/3, ¾ and 5/6 Quasi-Cyclic Codes to be proposed by GSFC • All codes to be validated by BOF taking as reference DVB-S2 characteristics.

  9. Objectives of BOF • Identify a set of mandatory/desirable requirements (addressing also interaction with modulation). • Define a Benchmark Matrix for evaluation of proposed codes wrt identified req’s. • Identify a set of Quasi-Cyclic LDPCC for frames of (approx) 8 & 16k bits (des.32k). • Select the proposed codes by proper benchmarking.

  10. Schedule of BOF • Identify requirements. • Define a Benchmark Matrix. By Fall 2004 • Identify a set of Quasi-Cyclic LDPCC for frames of (approx) 8 & 16k bits (des.32k). • Select the proposed codes by proper benchmarking. By Spring 2005 (Initial results) By Fall 2005 (Finalized results)

  11. One task for the WG? • The Orange Book Task is not dropped. • Shall it continue as (only) task of the WG while the code selection is moved to the newly created BOF?

More Related