HiRadMat - Status Adrian Fabich HiRadMat Technical Board CERN, 15th July 2014
Overview • Report from HiRadMat experiments in 2012 • Shut-down work • Summary of 2014 proposals A. Fabich
2012 experiments • 9 experiments completed • On average 4 weeks between 2 experiment • Partially grouped A. Fabich
2012 - Protons to HiRadMat • Total: 1.4*1016 protons • About 48 hours of SPS cycling for HiRadMat • Preparation, waiting and extractions • Similar time span in 2011 for commissioning A. Fabich
Experiments in 2012 • RIB target R&D • LHC transfer collimator (2x) • BLM validation • RP benchmarking • Crystal collimation PhDs completed: Juan Blanco, Nov. 2013 Nikos Charitonidis, March 2014 Beam tunneling (HRMT12) TE/MPE R. Schmidt et al. Powder target (HRMT10) C. Densham et al. A. Fabich
TPSG4 - 2012 A. Fabich
Shut-down work • Installation of additional cabling • Mainly for vacuum and HQ signal • Removal of experiments from • Remainders in TNC: • LPROT (HRMT12): follow-up required • TISD (HRMT01): removal delayed by availability of class-A lab • Removal of WNAF collimator blocks • Minimum advancement • lengthy preparations for and discussions with authorities A. Fabich
New Proposals in 2014 • 12 applications • Named 14xx (year 2014 + running number) • Running number in the order of reception • 9 invited for presentation/discussion • 3 proposals to be discussed “offline” “placing them on the radar screen” • TPGS4 (1402): repetition with slightly higher intensity • Supra Magnet (1406): later availability • Microphone (1411): purely parasitic A. Fabich
Beam parameter space A. Fabich
Time frame • One experiment interested in ion operation • Half the user groups are interested in TA (Transnational Access) A. Fabich
Future beam slots • 2014: 3 slots • 2015: 8(+1) slots) A. Fabich
Aim of Today Review the proposals In view of • Technical feasibility • Operational • Safety • Radiation-protection • Schedule • Follow-up: Written report on the view by the HRM Technical Board • Schedule future meeting – October 2014 A. Fabich