An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MiniCrates Status • ComponentsStatus (BTIM, TRB, CCB, SB) • MC production: quantity and rate, past and future • Production Schedule for the near future Flavio Dal Corso INFN-Pd

  2. BTIM • Production completed (12500 modules). • Production of spare modules (≈600) still in progress. CCB & SB • Production completed (250 boards + 40 spares) Flavio Dal Corso INFN-Pd

  3. TRB • Produced up to now: • 669 TRB Φ • 333 TRB θ • 65 TRB Φ32 • Buffers: (≈17 MC) • 82 TRB Φ • 157 TRB θ • 30 TRB Φ32 • Problems: • Production stopped during August • Many boards (≈15%) with faults (mostly detected during pre-test). • Buffers limited by shortage of TRB Φ. Flavio Dal Corso INFN-Pd

  4. MC produced up to now Flavio Dal Corso INFN-Pd

  5. 110 MC delivered 71 installed 9 for the September installation (100% of the chambers to be installed) 21 for the November-December installation (67%) 9 for further installations. MC produced: details Flavio Dal Corso INFN-Pd

  6. forecast for the future Note: n. of TRB expressed as n. of equivalent MC. TRB production (and manpower) are the limiting factors. Flavio Dal Corso INFN-Pd

  7. Production Schedule MC to be moved to Bologna MC to be received from CIEMAT Flavio Dal Corso INFN-Pd