1 / 11

How may I help you, Justine?

beau-malone
Télécharger la présentation

How may I help you, Justine?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Justine makes jewelry. She can currently make a pair of earrings with 20 beads in 30 minutes and a necklace with 30 beads in 30 minutes. She plans to use no more than 600 beads, work a maximum of 12 hours (720 minutes) and make at least 5 pairs of earrings and 5 necklaces. She makes $3.25 profit on each pair of earrings and $5.00 profit on each necklace. How many of each should she make to maximize a profit? How may I help you, Justine?

  2. Justine makes jewelry. She can currently make a pair of earrings with 20 beads in 30 minutes and a necklace with 30 beads in 30 minutes. She plans to use no more than 600 beads, work a maximum of 12 hours (720 minutes) and make at least 5 pairs of earrings and 5 necklaces. She makes $3.25 profit on each pair of earrings and $5.00 profit on each necklace. How many of each should she make to maximize a profit? What can we pull out of your question?

  3. Blue = Variables Pink = Bead Values Green = Minute Values Red & Purple = Minimal Production Values Yellow = Profit Values Now, What does each color mean?

  4. Our Formulas: E > 5 You must make at least 5 pairs of earrings N > 5 You must make at least 5 necklaces 20E + 30N < 600 You use 20 beads per each pair of earrings and 30 beads per each necklace, with a maximum of 600 beads 30E + 30N < 720 You spend 30 minutes on each pair of earrings and 30 minutes on each necklace, with a maximum of 720 minutes How can we use these values?

  5. Earrings

  6. Point A E = 5 N = 5 Let me do the math...

  7. Point B 20E + 30N = 600 -20(E = 5) 30N = 500 N = 16 2/3 E = 5

  8. Point C -1 (20E + 30N = 600) + 30E + 30N = 720 10E = 120 E = 12 20(12) + 30N = 600 240 + 30N = 600 30N = 360 N = 12

  9. Point D 30E + 30N = 720 -30(N = 5) 30E = 570 E = 19 N = 5

  10. P = 3.25E + 5N A 3.25(5) + 5(5) = 41.25 B 3.25(5) + 5(16 2/3) = 99.58 C 3.25(12) + 5(12) = 99.00 D 3.25(19) + 5(5) = 86.75 Your Profits!

  11. Profit Statement To Maximize profit by $99.58, make 5 pairs of earrings and 16 2/3 necklaces.

More Related