1 / 2

Texas Deregulation – A Success Story

24. 21. Internal combustion. 18. The ERCOT Market Framework Has Been A Success. ERCOT’s Robust Competitive Wholesale Market Led To A Large Capital Infusion…. 22 GW. 15. Gas/oil. 12. Market Objectives Leverage market solutions wherever possible and encourage competition

benito
Télécharger la présentation

Texas Deregulation – A Success Story

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 24 21 • Internal combustion 18 The ERCOT Market Framework Has Been A Success ERCOT’s Robust Competitive Wholesale Market Led To A Large Capital Infusion… 22 GW 15 • Gas/oil 12 Market Objectives • Leverage market solutions wherever possible and encourage competition • Minimize ERCOT intervention • Establish tools to maintain grid reliability ERCOT supply curve; Implied heat rate 04; MMBtu/MWh 9 • CCGT 6 • Coal • Nuclear 3 0 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 Implementation • Bilateral Contracts - Participants contract up to 100% of energy needs in lieu of a centrallymanaged market • Balancing Energy Market - ERCOT operates thin balancing energy pool to balance real-time supply and demand • Out of Merit - ERCOT can order plants on/off to maintain grid reliability • Retail Price to Beat (PTB) - Default service rate mandated for incumbent retailers until January 1, 2007 – may offer different prices starting in 05 ERCOT Cumulative capacity MW Positive impact • Large infusion of capital • Intense retail competition • Competitive rates for end-users • High system reliability • Deregulation led to investment of over $15 billion and the addition of 22GWof low-cost CCGT capacity 1 2 …And A Reduction In Market Heat Rates The ERCOT Regulatory Framework Has Led To StrongRetail Competition… ERCOT heat rate cycle 98-04; MMBtu/MWh • Residential Customer Switching • 04; percent CCGT reinvestment economics CCGT marginal heat rate Lower market heat rates have mitigated the effectsof higher gas prices for consumers • ERCOT has the most active de-regulated retail market in the US 3 4 Source: KEMA Texas Deregulation – A Success Story

  2. …Giving End Use Customers Access To Lower Prices • Competitive residential price1 vs. regulated rate • 02-04; Percent savings • Competitive large business price vs. regulated rate • 02-04; Percent 2 2 • Customers have benefited from access to lower electricity prices than they would have experienced under a regulated rate regime 1 Competitive Residential price based on 15% discount to TXU PTB as currently offered by market competitors, e.g., Utility Choice (14.6%), Cirro (14.6%) and Gexa (16.6%); Regulated world assumes 7.8 GW added capacity in the rate base at a cost of $600/kw, O&M costs approximately 20/kw-yr resulting in an average cost of $93/kw-yr average cost in the rate base 2 Based on 2004 with the following assumptions: Competitive prices assume $4.07/MMBtu Henry Hub gas price, 24X7 heat rate of 7.3 MWh/MMBtu, and incumbent residential gross margins of 30% and LC&I gross margins of 5% 5 6 7 8 Texas Deregulation – A Success Story …With Customer Switching In Line With Other Successful Deregulated Markets… • Incumbent market share1 • Years since deregulation; Percent • Wireline • North Texas residential • South Texas residential • UK residential2 1 Market share estimates based on customer count 2 Estimates for 2003 and 2004 Source: PUC; OFGEM There Is Still Room For Improvement In ERCOT… …As Key Milestones Approach • Sunset Review1 • The Sunset Advisory Commission reviews performance of The Public Utility Commission of Texas (PUC) and the Office of Public Utility Counsel (OPUC) every 12 years • The next review should be completed during the 2005 session • Key recommendations of the Sunset Advisory Commission include: • Changes to ERCOT/PUC governance structure • Extension of the PUC for 6 years • Market inefficiencies drive significant costs to market participantsacross the ERCOT system • The competitive market in Texas is functioning well andTXU does not anticipate any major structural changes in the marketplace 1 Estimated cost of bad debt for key ERCOT retailers in 2003; TXU retail bad debt in 2003 was $120 MM 2 OOME down cost to the system 3 Reduction of “ask” price to energy retailers of 0.2 cents / KWh on 300 TWh 4 Unaccounted for energy costs at 1% of load at $40 / MWh on 300 TWh (Line loss can represent an additional 5% of load cost) 5 Based on 6 month RMR costs for delay at La Palma of $15 million and 12 month RMR costs on delay at Davis of $30 MM 6 ERCOT requires approximately 2 GW of new capacity per year; better siting reduces transmission cost by $10,000 per MW 1 The Sunset process is guided by a 12-member body of legislators and public members appointed by the Lieutenant Governor and the Speaker of the House of Representatives.

More Related