An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IHEP Cryomodule Status Jiyuan Zhai On behalf of the IHEP ILC SRF R&D Team AWLC14, May 14, Fermilab

  2. Outline • IHEP ILC-TC1 Cryomodule Assembly • Horizontal Test Facilities • Cavity Fabrication

  3. IHEP ILC-TC1 Cryomodule • Short cryomodule with one low-loss large grain 9-cell cavity (VT 20MV/m, Q0=1.4E10) • Cylindrical magnetic shield inside helium vessel • STF type input coupler and tuner • Module assembly to complete in July 2014, horizontal test in 2015

  4. Cryomodule Assembly Assembly Hall in IHEP Building #2

  5. Cavity Clean Room Assembly

  6. Cavity Clean Room Assembly Beam Tube Assembly Gate Valve Assembly Cavity Assembly Prep Careful Clean Room Assembly Operations (PFFA)

  7. Cavity Clean Room Assembly • Slow Pumping and N2 Purging • Middle-position slide jack tuner with four guiding rods • Helium vessel bellow and tuner flanges sagging when loose the support fixtures; will be restored when the tuner is installed. • Coupler Mounting Test 2mm

  8. Outline • IHEP ILC-TC1 Cryomodule Assembly • Horizontal Test Facilities • Cavity Fabrication

  9. Horizontal Test Facility Layout IHEP Building #1 Cryogenic Plant In commissioning Power Source Deliver in end 2014 Tunnel Horizontal test & beam test Vertical test Dewar Deliver in September

  10. Cryogenic System in Commissioning Cold box and compressor: refrigeration 1000W@4.5K, liquefication: 284 L/h 2K pumps: 8000 m3/h @ 3100 Pa

  11. 1.3 GHz Klystron and Modulator Ordered • 1.3 GHz 5 MW Klystron and Marx Modulator will deliver in end 2014

  12. Outline • IHEP ILC-TC1 Cryomodule Assembly • Horizontal Test Facilities • Cavity Fabrication

  13. TESLA-like Cavity Fabrication • End groups EBW ongoing • Cavity EBW to be done in July • Process and test at KEK

  14. TESLA Cavity Production • HERT Company • FG TESLA 9-cell cavity • Pressing and EBW test and optimization • One prototype in 2014

  15. Summary • IHEP ILC test cryomodule assembly is ongoing and will be finished in July 2014. • Hardware preparation, environment and component cleanliness, vacuum, alignment and assembly procedures are studied and conducted carefully for cavity clean room assembly. • Cryogenic system and power source will be ready in end 2014 for the module horizontal test. • Prototype production of a fine grain TESLA-like 9-cell cavity and a fine grain TESLA 9-cell cavity will be done in mid and end 2014 respectively.

  16. Thank you!