SPANDEX: ACS Cable System Project

SPANDEX: ACS Cable System Project Presented by: Steve Gebert, ACS Director for PMO Sherrie Greenshields, NHTI Marko Radonich, CH2MHILL Dale Patrick, ACS OSP Manager Purpose of Briefing Purpose:

betty_james
Télécharger la présentation

SPANDEX: ACS Cable System Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPANDEX: ACS Cable System Project Presented by: Steve Gebert, ACS Director for PMO Sherrie Greenshields, NHTI Marko Radonich, CH2MHILL Dale Patrick, ACS OSP Manager

  2. Purpose of Briefing • Purpose: • Provide overview of project for permitting authorities and other interested agencies • Ensure all questions and requests for information are addressed so that project can proceed according to agencies’ satisfaction, and according to schedule

  3. Overview • Overview: • SPANDEX highlights and route overview • Key objectives of route selection and installation techniques • List of primary construction activities • Route specifics by area (walkthrough of route) • Critical Contractual Deadlines • Permits roll call • Questions and answers • Points of Contact

  4. SPANDEX: What it Brings to Alaska • $100M fiber-optic cable system linking Alaska to Lower 48 • Unique route – high emphasis on diversity from existing cables • Landing in Oregon – highly diverse from other AK cables • Huge capacity (bandwidth) • Initial capacity: Over 500,000 simultaneous calls • Max capacity: Over 33,000,000 simultaneous calls • 25-year service life • Cutting-edge technology • Target Service Date: December 31, 2008

  5. Overview of Marine Segments

  6. Overview of Main Terrestrial Segments Cable Station

  7. Key Objectives of Route Selection • Diversity from existing systems • Redundancy on terrestrial routes • Best marine and terrestrial conditions for landings • Maximum use of existing facilities, easements, RoW, developed areas • Maximum avoidance of heavy fishing, anchoring, and other sensitive areas

  8. Impact Mitigation Techniques • Expertise and Experience • Extreme diligence in selecting contractors with extensive experience—including AK cable projects (drawing on all lessons learned) • Marine segment burial depth • Spec is 1.2m burial depth in all areas of water depth less than 1500m • Extensive sonar survey to find route that best supports burial • Very slow ship speed (1-2 kts when pulling plow) • Horizontal Direction Drilling (HDD) • Extremely expensive but minimizes/eliminates impact on coastal areas – ACS feels its well worth the cost

  9. Impact Mitigation Techniques (cont.) • Construction Timing • Earliest possible construction where able to avoid impact on wetlands, bird nesting season, tourist season, etc. • Need your help with this—permits are critical path in schedule

  10. Primary AK Construction Activities • Marine segments • Anchorage to Nikiski • Homer to Oregon • Terrestrial segments (Outside Plant– OSP) • Anchorage • Nikiski to ACS N. Kenai Wire Center • Ninilchik to Homer • Homer • Landings – Bore (HDD) and Beach Manhole (BMH) • Anchorage • Nikiski • Homer (also Ocean Ground Bed – OGB) • Cable Stations • Homer

  11. Marine Schedule

  12. Marine Schedule (and key sensitive areas)

  13. Route Specifics -- Anchorage • HDD from ocean side of Coastal Wildlife Refuge to BMH • Minimal impact on wildlife • No closure of Coastal Trail • OSP route max use of easements/Row • Tesoro easement • Airport fence line • Along road in Kincaid • Rasp. Rd. • Cable Shelter at Rasp. and Sand Lake • Small hut • Collocated with ATT cell site

  14. Route Specifics -- Anchorage

  15. Anchorage HDD

  16. Route Specifics -- Nikiski • HDD from BMH to 6m water depth • BMH in Marathon Oil easement area • New build from BMH to existing ACS Wire Center • Max use of RoW and easements

  17. Nikiski HDD

  18. Route Specifics – Nikiski to Homer • New build from BMH to ACS N. Kenai Wire Center • Existing plant to Ninilchik • New build from Ninilchik to Homer • Max use of RoW, easements, aerial routes

  19. Route Specifics -- Homer • New Cable Station and Retail Store • OSP to BMH – RoW/Easements • HDD to beach headwall (buried) at high water mark • Trenched in to low water mark • OGB – located in Ohlson Ln.

  20. Typical OGB

  21. Homer HDD

  22. Critical Contractual Deadlines • Anchorage and Nikiski build complete: 8/19/08 • Nikiski to Homer build complete: 8/19/08 • Homer build complete: 8/19/08 • Homer to OR segment ready for testing: 9/18/08 • System ready for customers: 12/31/08 • Ready to start ASAP to minimize seasonal impacts • Permits are currently driving timeline • Greatly appreciate your support!

  23. Permits Roll Call • Any required permits that we have not yet applied for? • Any additional agencies that we should contact?

  24. Questions and Answers

  25. Points of Contact • Steve Gebert, ACS • 907.564.1244 • sgebert@acsalaska.com • Sherrie Greenshields, NHTI • 907.761.6057 • sgreenshields@nhtiusa.com • Marko Radonich, CH2MHILL • 907.646.0332 • marko.radonich@ch2m.com • Dale Patrick, ACS • 907.564.1582 • dale.patrick@acsalaska.com