ATLAS@CERN

ATLAS@CERN. Woochun Park @USC Meeting 3/26/2007. News. March 27, 2007 Structures supporting the inner “cold mass” of one of the three magnets within its enclosing cryostat broke at a pressure of 20 atmospheres, in response to asymmetric forces applied during the test. No injury.

bibeau
Télécharger la présentation

ATLAS@CERN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATLAS@CERN Woochun Park @USC Meeting 3/26/2007

  2. News • March 27, 2007 • Structures supporting the inner “cold mass” of one of the three magnets within its enclosing cryostat broke at a pressure of 20 atmospheres, in response to asymmetric forces applied during the test. • No injury. • Fermilab is responsible for the magnet. • LHC experiment may be delayed. • http://user.web.cern.ch/user/QuickLinks/Announcements/2007/LHCInnerTriplet.html • March 29, 2007 • Installed the last Muon Barrel chamber. • Connecting up and commissioning of the chambers soon.

  3. Magnet Field Measurement • The NMR system :: • Intended to monitor the magnetic field strength at a small number of points in the Inner Detector volume. • Four NMR probes will be installed at Z=0, R=1139 mm and equally spaced in azimuth (45, 135, 225, 315 degree). • http://www.hep.man.ac.uk/atlas/bfield/NMRsystem-v2.doc • http://www.hep.man.ac.uk/atlas/bfield/index.html • Hall Probes System: • 1500 sensors • http://www.cern.ch/Atlas/GROUPS/PHYSICS/TDR/physics_tdr/printout/Volume_I/letter/Mass_scale_letter.ps.gz (Ch.12.4.3)

  4. High L1 rate Large events Ambitious trigger and data acquisition. Introduction : Comparison http://pi.physik.uni-bonn.de/teilchenseminar/teilchenseminar0506/stamen.pdf

  5. L1 Trigger • Maximum output rate ~100kHz limited by sub-detector readout system capabilities and L2 trigger. • Data are held in pipeline memories. • RoI (Region of Interest) would trigger; high pT, electrons, photons, jets, muons. • Muon and Calo information is used in separate L1 processor. • ID is not used. • Threshold eg: • Jets 8, FWJets 2*4 • EM: 8-16, Tau: 8-10 • Etsum, Etsum(jets), ETmiss = 4,4,4 • Muon 6

  6. CSC Waveform Sampling • ATLAS Environment • 25ns beam bunch spacing  40MHz rate • CSC maximum drift time 35ns • Need to cover 100 ns any time with maximum drift time considered. • 20MHz sampling (50ns) is selected. • http://ph-collectif-lecc-workshops.web.cern.ch/ph-collectif-lecc-workshops/LEB00_Book/muon/vetter_muon.pdf • http://ph-collectif-lecc-workshops.web.cern.ch/ph-collectif-lecc-workshops/LEB00_Book/daq/vetter.pdf Minimum Drift time Maximum Drift time Minimum Drift time Maximum Drift time

  7. Sparsification • The on-detector electronics amplifies and shapes the cathode strip signals, and stores the pulse height information during the level 1 trigger latency. • Upon receipt of a “level 1 trigger accept”, four time samples are digitized and transmitted via high-speed fiber-optic G-Links to off-detector electronics. • Sampling and digitization are performed on-detector but are controlled by the off-detector electronics, which consists of optical transition modules and readout drivers (RODs). • There are two stages in ROD processes. • Sparsification :Suppress hits below threshold and hits not associated with the current bunch crossing. • Rejection : find tracks and removes isolated neutron hits. • In ROD processes, C code is written by UCI graduate student. Vinnie want someone to look at this code and understand it for the future modification. • http://ieeexplore.ieee.org/iel5/23/29095/01310541.pdf?arnumber=1310541

  8. Hardware • Met Elliott Cheu@Arizona. He has one student who work for access to database. • Discuss about when we measure pedestal for CSC detector in real data taking. • Plan to meet at Bldg#184 to learn how to operate CSC chambers in detail. Previously, I learn how to do it in software interface.

  9. ByteStream Converter for cosmic data • ByteStreamConverter takes more while than expected. • There is an issue of mapping from a series of four chambers to the real detector installation. • For cosmic data, standalone code might be more useful to measure resolution, alignment, etc. • Better use standalone code to analyze cosmic data and understand calibration/alignment.

  10. SW Development • I am in 13.0.X-MIG nightlies version for SW development. • Then, there are seven releases rel_0,……, rel_6 for Sunday,……, Saturday. • Every midnight, they collect the latest versions of all the packages and • compile them to make rel_X for the next day.

  11. There are failed builds. The package failed during the compile should be updated soon. Release after Release, the number of failed will be decreased and be the official release.

  12. You can check the list of failed package. CscClusterization is my working package. If you click it, you can see the compilation log file.

  13. CscClusterization-00-11-04 I did ‘cvs commit’ and ‘cvs tag CscClusterization-00-11-04’ recently. But, they didn’t copy the most recent one. (tag collector should do this) As shown in this example, you can see the other dependent package build up and correct it if you can with cvs co.

  14. Computing Resource • Initially, 50 Mb was assigned. • After email to Helpdesk@cern.ch, I have 400 Mb. It could be up to 800 Mb. • After email to atlas-support@cern.ch, I got 500 Mb scratch0 disk space which isn’t backup regularly. • To mount our disk space, we need to contact atlas-support@cern.ch • To install CERN linux SLC4 (http://linux.web.cern.ch/linux/).  All ofthe software that we need for CERN should be available.  Pacman, lxplus, and kerberose shouldall be included in the installation. • Currently, SLC3 and SLC4 are being used in CERN and SLC4 will be the main one in the end. In SLC4, 32bit and 64bit are available. When you set up athena environment you should specify 32bit or 64bit as • source ~/cmthome/setup.csh -tag=32,dbg,rel_3,runtime,mig • http://www.openafs.org • http://atlas.web.cern.ch/Atlas/GROUPS/SOFTWARE/DOCUMENTS/SOFTWARE_MANUAL/HTML/ATLASSW/

  15. Highlight of event in June • It’s extremely helpful to get advices from experts and attend to as many presentations as possible. • 4 - 7 June  Trigger and Physics Week (CERN) • 11 - 14 June MUON Week (CERN) • 25-29 June Software and Computing Workshop (CERN) • 25-26 June LHC Detector Alignment Workshop (CERN) • 6 - 15 June 2007, 2nd CERN-Fermi lab Hadron Collider Physics Summer school • 02 - 06 July . Inner Detector Week (CERN) • Visit CERN in the beginning of June for a month. • 9 – 14 July ATLAS Week in Glasgow, Scotland • 3 – 5 Sep Muon Week in CERN • 8 – 12 Oct ATLAS Week in CERN • 5 – 8 Nov T/P Week in CERN • 12-15 Nov Muon Week in CERN • (Probably) Visit CERN in September, October or November